Drill Stem Tests Database
Specific Well--15-195-22187
API: 15-195-22187
Operator: John O. Farmer, Inc.
Field: Cedar Bluff East
Lease: Honas
Well 1
Location: T14S R22W, Sec. 21, NW NE SE
2310 North, 890 West, from SE corner
Longitude: -99.7663382
Latitude: 38.8191523
County: Trego
Status: OIL-P&A
Spud Date: 28-JAN-97
Completion Date: 25-FEB-97
Plugging Date: 19-MAY-00
Total Depth: 4220
Form. at depth: CHEROKEE GROUP
Elevation: 2238 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 4116 to 4128
Formation tested: Cherokee Sand. C
Date, Time: 03-FEB-97; 15:43:15
Initial Hydro Pressure: 2025 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 101 PSI
Initial Shut-in Pressure: 1187 PSI
Second Initial Flow Pressure: 115 PSI
Second Final Flow Pressure: 178 PSI
Final Shut-in Pressure: 1170 PSI
Final Hydro Pressure: 1994 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4120 ft.
Initial Flow: Stron blow, bottom of bucket in 3.75 mins Initial Shut In: Weak to fair blow
Final Flow: Strong blow, Bottom of bucket in 5 mins.
Final Shut In: Weak to fair blow
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 20
Samples: none
Gas Recovery:
Comments:
Recovery
440 of Total Fluid
440 of Fluid in Drill Pipe
620 of Gas in Pipe.
315 of Gassy Oil Gas approx.12%
125 of Slight Oil Cut Muddy Water 4%O 16%M 80%W
48000 of Salinity (PPM)
36 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.