Drill Stem Tests Database
Specific Well--15-195-22195
API: 15-195-22195
Operator: Richard H. Zinszer Oil Co.
Field: Sunny Slope North
Lease: LeCuyer
Well 1
Location: T14S R21W, Sec. 15, SE SW NE
2970 North, 1650 West, from SE corner
Longitude: -99.6383367
Latitude: 38.8349406
County: Trego
Status: OIL-P&A
Spud Date: 07-OCT-97
Completion Date: 15-OCT-97
Plugging Date: 15-OCT-97
Total Depth: 4020
Form. at depth: ARBUCKLE GROUP
Elevation: 2213 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3613 to 3648
Formation tested: Lansing D-F
Date, Time: 13-OCT-97; 02:45:22
Initial Hydro Pressure: 1796 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 1107 PSI
Second Initial Flow Pressure: 35 PSI
Second Final Flow Pressure: 36 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1775 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2744 ft.
Initial Flow: Weak surface blow building to 1.5""
Final Flow: No blow-- pulled tool
Bottom Hole Temperature: 108 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Pipe
20 of mud with oil spots
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3935 to 3980
Formation tested: Cherokee Sand
Date, Time: 14-OCT-97; 20:33:31
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3081 ft.
Initial Flow: Weak 1/8"" blow, died in 29 minutes
Final Flow: No blow
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Pipe
5 of Oil Specked Mud
View Pressures No Recovery Gas data.