Drill Stem Tests Database
Specific Well--15-199-20239
API: 15-199-20239
Operator: BRITO OIL
Field: Mount Sunflower Northeast
Lease: AKERS TRUST
Well 1-20
Location: T15S R41W, Sec. 20, SW SW
660 North, 660 East, from SW corner
Longitude: -101.907243
Latitude: 38.7287799
County: Wallace
Status: D&A
Spud Date: 07-AUG-96
Completion Date: 17-AUG-96
Plugging Date: 17-AUG-96
Total Depth: 3965
Form. at depth: MISSISSIPPIAN
Elevation: 3833 KB
Test Number: 3 Data Source: TRILOBITE
Interval: 5106 to 5160
Formation tested: Lower Morrrow
Date, Time: 16-AUG-96; 15:37:07
Initial Hydro Pressure: 2479 PSI
First Initial Flow Pressure: 97 PSI
First Final Flow Pressure: 336 PSI
Initial Shut-in Pressure: 850 PSI
Second Initial Flow Pressure: 349 PSI
Second Final Flow Pressure: 473 PSI
Final Shut-in Pressure: 787 PSI
Final Hydro Pressure: 2405 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 480 ft.
Drill Pipe Length: 4616 ft.
Initial Flow - Weak to fair blow off bottom in 8 min
Initial Shutin - Bled off blow, surface return blow throughout
Final Flow - Weak return slowly built to bottom in 20 min
Final Shutin - Bled off blow, surface return died in 15 min
Bottom Hole Temperature: 144 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
945 of Total Fluid
480 of Fluid in Drill Collars
465 of Fluid in Drill Pipe
30 of Gas in pipe
30 of Slightly gassy mud cut water w/ trace of oil-
915 of Salt water
40000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4980 to 5022
Formation tested: Upper Morrow
Date, Time: 17-AUG-96; 06:40:53
Initial Hydro Pressure: 2395 PSI
First Initial Flow Pressure: 33 PSI
First Final Flow Pressure: 64 PSI
Initial Shut-in Pressure: 938 PSI
Second Initial Flow Pressure: 73 PSI
Second Final Flow Pressure: 111 PSI
Final Shut-in Pressure: 934 PSI
Final Hydro Pressure: 2353 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 326 ft.
Drill Pipe Length: 4647 ft.
Initial Flow - Weak surface blow slowly built to 10""
Initial Shutin - Bled off blow - no return
Final Flow - Fair to strong blow off bottom in 3 min
Final Shutin - Bled off blow, surface return died in 15 min
Bottom Hole Temperature: 136 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
210 of Total Fluid
210 of Fluid in Drill Collars
980 of Gas in pipe
30 of Drilling mud
90 of Gassy slightly oil & water cut mud -
90 of Slightly oil cut watery mud -
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.