API: 15-199-20250
Operator: PETEX INC Field: Mount Sunflower Northeast Lease: CLINE Well 1 |
Location: T15S R41W, Sec. 17, SE SW
660 North, 3300 West, from SE corner Longitude: -101.9022875 Latitude: 38.7434055 County: Wallace Status: OIL-P&A |
Spud Date: 25-JUN-97
Completion Date: 05-JUL-97 Plugging Date: 13-DEC-04 Total Depth: 5175 Form. at depth: MISSISSIPPIAN Elevation: 3800 KB |
Discovery well for Mount Sunflower Northeast. |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4950 to 5015
Formation tested: Marrow Sd. | Date, Time: 02-JUL-97; 18:26:07 |
Initial Hydro Pressure: 2483 PSI
First Initial Flow Pressure: 134 PSI First Final Flow Pressure: 202 PSI Initial Shut-in Pressure: 1046 PSI Second Initial Flow Pressure: 217 PSI Second Final Flow Pressure: 320 PSI Final Shut-in Pressure: 1032 PSI Final Hydro Pressure: 2306 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 519 ft. Drill Pipe Length: 4454 ft. |
Initial Flow: Strong blow, bottom of bucket in 3 min Initial Shut In: Bled down 5 mins, bottom of bucket in 5 mins, Gas to surface during shutin Final Flow: Strong blow, Gauge Gas, See volume report Initial Shut In: Bled down, bottom of bucket in 2 mins |
|
Bottom Hole Temperature: 139 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 880 of Total Fluid 519 of Fluid in Drill Collars 361 of Fluid in Drill Pipe 210 of Heavy muddy Water Cut gassy Oil 400 of Heavy Watery Mud with Trace Oil 270 of Oil cut Gassy Muddy Water 25000 of Salinity (PPM) 18 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5048 to 5110
Formation tested: Lower Morrow | Date, Time: 03-JUL-97; 18:12:53 |
Initial Hydro Pressure: 2577 PSI
First Initial Flow Pressure: 459 PSI First Final Flow Pressure: 862 PSI Initial Shut-in Pressure: 1021 PSI Second Initial Flow Pressure: 885 PSI Second Final Flow Pressure: 1007 PSI Final Shut-in Pressure: 1036 PSI Final Hydro Pressure: 2344 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 519 ft. Drill Pipe Length: 4514 ft. |
Initial Flow: Strong blow, bottom of bucket in 1.5 minutes Initial Shut In: Bled down for 5 minutes, built back to 4.5"" Final Flow: Strong blow, bottom of bucket in 2 min Final Shut In: Bled down for 5 mins, built to 3"" |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 2186 of Total Fluid 519 of Fluid in Drill Collars 1667 of Fluid in Drill Pipe 186 of Slight Mud Cut Water 2000 of Salt Water 35000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |