Drill Stem Tests Database
Specific Well--15-199-20250
API: 15-199-20250
Operator: PETEX INC
Field: Mount Sunflower Northeast
Lease: CLINE
Well 1
Location: T15S R41W, Sec. 17, SE SW
660 North, 3300 West, from SE corner
Longitude: -101.9022875
Latitude: 38.7434055
County: Wallace
Status: OIL-P&A
Spud Date: 25-JUN-97
Completion Date: 05-JUL-97
Plugging Date: 13-DEC-04
Total Depth: 5175
Form. at depth: MISSISSIPPIAN
Elevation: 3800 KB
Discovery well for Mount Sunflower Northeast.
Test Number: 1 Data Source: TRILOBITE
Interval: 4950 to 5015
Formation tested: Marrow Sd.
Date, Time: 02-JUL-97; 18:26:07
Initial Hydro Pressure: 2483 PSI
First Initial Flow Pressure: 134 PSI
First Final Flow Pressure: 202 PSI
Initial Shut-in Pressure: 1046 PSI
Second Initial Flow Pressure: 217 PSI
Second Final Flow Pressure: 320 PSI
Final Shut-in Pressure: 1032 PSI
Final Hydro Pressure: 2306 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 519 ft.
Drill Pipe Length: 4454 ft.
Initial Flow: Strong blow, bottom of bucket in 3 min Initial Shut In: Bled down 5 mins, bottom of bucket in 5 mins, Gas to surface during shutin
Final Flow: Strong blow, Gauge Gas, See volume report Initial Shut In: Bled down, bottom of bucket in 2 mins
Bottom Hole Temperature: 139 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
880 of Total Fluid
519 of Fluid in Drill Collars
361 of Fluid in Drill Pipe
210 of Heavy muddy Water Cut gassy Oil
400 of Heavy Watery Mud with Trace Oil
270 of Oil cut Gassy Muddy Water
25000 of Salinity (PPM)
18 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5048 to 5110
Formation tested: Lower Morrow
Date, Time: 03-JUL-97; 18:12:53
Initial Hydro Pressure: 2577 PSI
First Initial Flow Pressure: 459 PSI
First Final Flow Pressure: 862 PSI
Initial Shut-in Pressure: 1021 PSI
Second Initial Flow Pressure: 885 PSI
Second Final Flow Pressure: 1007 PSI
Final Shut-in Pressure: 1036 PSI
Final Hydro Pressure: 2344 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 519 ft.
Drill Pipe Length: 4514 ft.
Initial Flow: Strong blow, bottom of bucket in 1.5 minutes Initial Shut In: Bled down for 5 minutes, built back to 4.5""
Final Flow: Strong blow, bottom of bucket in 2 min
Final Shut In: Bled down for 5 mins, built to 3""
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2186 of Total Fluid
519 of Fluid in Drill Collars
1667 of Fluid in Drill Pipe
186 of Slight Mud Cut Water
2000 of Salt Water
35000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.