Drill Stem Tests Database
Specific Well--15-203-20126
API: 15-203-20126
Operator: Kaiser-Francis Oil Co.
Field: Rupp
Lease: Caldwell 'C'
Well 5
Location: T20S R38W, Sec. 34, E2 E2 SW
1310 North, 2310 East, from SW corner
Longitude: -101.5036751
Latitude: 38.2667713
County: Wichita
Status: OIL-P&A
Spud Date: 08-NOV-97
Completion Date: 17-JAN-98
Plugging Date: 13-JUL-10
Total Depth: 4950
Form. at depth: MISSISSIPPIAN
Elevation: 3410 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4718 to 4828
Formation tested: Morrow Sands
Date, Time: 16-NOV-97; 17:48:07
Initial Hydro Pressure: 2403 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 221 PSI
Initial Shut-in Pressure: 547 PSI
Second Initial Flow Pressure: 271 PSI
Second Final Flow Pressure: 514 PSI
Final Shut-in Pressure: 530 PSI
Final Hydro Pressure: 2256 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.68 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 4313 ft.
Initial Flow: Strong Blow Bottom of Bucket in 11 minutes. Initial Shut-in: Blowback built to Bottom of Bucket in 54 minutes.
Final Flow: Strong Blow Bottom of Bucket in 6 minutes.
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples: OIl
Gas Recovery:
Comments:
Recovery
760 of Total Fluid
544 of Fluid in Drill Collars
216 of Fluid in Drill Pipe
1240 of Gas in pipe.
120 of Gassy muddy oil 20%gas 70%oil 10%mud
60 of Gassy muddy oil 10%gas 80%oil 10%mud
240 of Gassy muddy oil 30%gas 60%oil 10%mud
340 of Gassy muddy oil 20%gas 70%oil 10%mud
32 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.