|
API: 15-203-20127
Operator: Abercrombie Drilling, Inc. Field: White Woman North Lease: Titus Well 2 |
Location: T20S R35W, Sec. 26, NE
1320 South, 1320 West, from NE corner Longitude: -101.1483976 Latitude: 38.2898746 County: Wichita Status: OIL |
Spud Date: 15-AUG-97
Completion Date: 18-SEP-97 Plugging Date: Total Depth: 5080 Form. at depth: MISSISSIPPIAN Elevation: 3160 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4582 to 4605
Formation tested: Beymer | Date, Time: 24-AUG-97; 16:00:22 |
|
Initial Hydro Pressure: 2242 PSI
First Initial Flow Pressure: 102 PSI First Final Flow Pressure: 382 PSI Initial Shut-in Pressure: 1190 PSI Second Initial Flow Pressure: 409 PSI Second Final Flow Pressure: 730 PSI Final Shut-in Pressure: 1166 PSI Final Hydro Pressure: 2189 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4256 ft. |
|
Initial Flow: Strong blow off bottom in 1 min Initial Shut In: Bled off blow - surface return built to bottom in 5 mins Final Flow: Fair to strong blow off bottom in 1 min Gas To Surface @ 30 mins Final Shut In: Bled off blow - built to bottom in 5 mins |
|
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2110 of Total Fluid 2110 of Fluid in Drill Pipe 1930 of Gassy Oil 180 of Gassy Heavy Mud Cut Oil 33 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4411 to 4439
Formation tested: | Date, Time: 23-AUG-97; 02:10:16 |
|
Initial Hydro Pressure: 2153 PSI
First Initial Flow Pressure: 256 PSI First Final Flow Pressure: 1145 PSI Initial Shut-in Pressure: 1170 PSI Second Initial Flow Pressure: 1153 PSI Second Final Flow Pressure: 1174 PSI Final Shut-in Pressure: 1176 PSI Final Hydro Pressure: 2116 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4100 ft. |
|
Initial Flow: Strong blow off bottom in 1 min Initial Shut In: Bled off blow - no return Final Flow: Weak blow builte to 9"" then decreased to 6"" Final Shut In: Bled off blow - no return |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2545 of Total Fluid 2545 of Fluid in Drill Pipe 2545 of Sulfur Water 26000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4508 to 4526
Formation tested: Marmaton | Date, Time: 23-AUG-97; 21:25:27 |
|
Initial Hydro Pressure: 2198 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 108 PSI Initial Shut-in Pressure: 857 PSI Second Initial Flow Pressure: 115 PSI Second Final Flow Pressure: 196 PSI Final Shut-in Pressure: 849 PSI Final Hydro Pressure: 2106 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4193 ft. |
|
Initial Flow: Weak to fair blow built to 7"" Initial Shut In: Bled off blow - no return Final Flow: Weak return slowly built to 3"" Final Shut In: Bled off blow - no return |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 330 of Total Fluid 330 of Fluid in Drill Pipe 5 of Free Oil 325 of Muddy Water 20000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |