Drill Stem Tests Database
Specific Well--15-033-20994
API: 15-033-20994
Operator: R. J. PATRICK OPERATING CO.
Field: Wildcat
Lease: Herd, Harold
Well 2-15
Location: T32S R19W, Sec. 15, NW NW NW
330 South, 330 East, from NW corner
Longitude: -99.38124
Latitude: 37.26474
County: Comanche
Status: GAS-P&A
Spud Date: 15-FEB-99
Completion Date: 28-FEB-99
Plugging Date: 04-OCT-10
Total Depth: 5300
Form. at depth: ARBUCKLE
Elevation: 2053 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4810 to 4827
Formation tested: Kansas City
Date, Time: 23-FEB-99; 09:28:56
Initial Hydro Pressure: 2339 PSI
First Initial Flow Pressure: 112 PSI
First Final Flow Pressure: 641 PSI
Initial Shut-in Pressure: 1737 PSI
Second Initial Flow Pressure: 668 PSI
Second Final Flow Pressure: 1087 PSI
Final Shut-in Pressure: 1741 PSI
Final Hydro Pressure: 2295 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 4451 ft.
Initial Flow: Strong blow bottom of bucket in 2.5 mins. Initial Shut-in: Weak blow. (1/4"")
Final Flow: Strong blow bottom of bucket in 4.25 mins.
Final Shut-in: No blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 20
Samples:
Gas Recovery:
Comments:
Recovery
2160 of Total Fluid
358 of Fluid in Drill Collars
2102 of Fluid in Drill Pipe
120 of Gas cut muddy water 5% gas 45% mud 50% water
2040 of Gas and mud cut water 8% gas 2% mud 90% water
140000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5008 to 5040
Formation tested: Marmaton
Date, Time: 24-FEB-99; 15:28:11
Initial Hydro Pressure: 2419 PSI
First Initial Flow Pressure: 39 PSI
First Final Flow Pressure: 167 PSI
Initial Shut-in Pressure: 1776 PSI
Second Initial Flow Pressure: 179 PSI
Second Final Flow Pressure: 331 PSI
Final Shut-in Pressure: 1743 PSI
Final Hydro Pressure: 2372 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 4637 ft.
Initial Flow: Fair to strong blow bottom of bucket in 8 mins. Initial Shut-in: No blow.
Final Flow: Fair to strong blow bottom of bucket in 24 mins.
Final Shut-in: No blow
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 12
Samples:
Gas Recovery:
Comments:
Recovery
560 of Total Fluid
358 of Fluid in Drill Collars
202 of Fluid in Drill Pipe
185 of Gas in pipe.
90 of Oil cut watery mud 3% Oil 17% Water 80% Mud
470 of Gassy salt water 5% Gas 95% Water
104000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5064 to 5076
Formation tested: Pawnee
Date, Time: 25-FEB-99; 09:43:20
Initial Hydro Pressure: 2475 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 88 PSI
Initial Shut-in Pressure: 1773 PSI
Second Initial Flow Pressure: 94 PSI
Second Final Flow Pressure: 144 PSI
Final Shut-in Pressure: 1750 PSI
Final Hydro Pressure: 2439 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 4701 ft.
Initial Flow: Strong blow bottom of bucket in 4 mins. Initial Shut-in: No blow.
Final Flow: Fair to strong blow bottom of bucket in 20 mins.
Final Shut-in: No bow
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 12
Samples: none
Gas Recovery:
Comments:
Recovery
260 of Total Fluid
260 of Fluid in Drill Collars
80 of Gas cut mud 8% gas 92% mud
180 of Muddy water 10% mud 90% water
84000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5089 to 5116
Formation tested: Ft. Scott
Date, Time: 26-FEB-99; 03:42:55
Initial Hydro Pressure: 2474 PSI
First Initial Flow Pressure: 43 PSI
First Final Flow Pressure: 58 PSI
Initial Shut-in Pressure: 1877 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 1871 PSI
Final Hydro Pressure: 2474 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 4701 ft.
Initial Flow: Strong blow gas to surface in 5 mins. See gas volume report Initial Shut-in Weak blow.
Final Flow: Strong blow See gas volume report
Final Shut-in: Weak blow
Bottom Hole Temperature: 107 DEG F
Percent Porosity: 11
Samples: gas sample
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of Drilling mud
7000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5210 to 5267
Formation tested: Miss.
Date, Time: 27-FEB-99; 15:49:23
Initial Hydro Pressure: 2546 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 49 PSI
Initial Shut-in Pressure: 1593 PSI
Second Initial Flow Pressure: 50 PSI
Second Final Flow Pressure: 57 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2515 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 4828 ft.
Initial Flow: Strong blow gas to surface in 9.5 mins. see gas volume report Initial Shut-in: Weak blow.
Final Flow: Strong blow see gas volume report
Final Shut-in: Weak blow
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 10
Samples: gas sample
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Collars
80 of Gas cut mud 10% gas 90% mud
7000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.