API: 15-033-20994
Operator: R. J. PATRICK OPERATING CO. Field: Wildcat Lease: Herd, Harold Well 2-15 |
Location: T32S R19W, Sec. 15, NW NW NW
330 South, 330 East, from NW corner Longitude: -99.38124 Latitude: 37.26474 County: Comanche Status: GAS-P&A |
Spud Date: 15-FEB-99
Completion Date: 28-FEB-99 Plugging Date: 04-OCT-10 Total Depth: 5300 Form. at depth: ARBUCKLE Elevation: 2053 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4810 to 4827
Formation tested: Kansas City | Date, Time: 23-FEB-99; 09:28:56 |
Initial Hydro Pressure: 2339 PSI
First Initial Flow Pressure: 112 PSI First Final Flow Pressure: 641 PSI Initial Shut-in Pressure: 1737 PSI Second Initial Flow Pressure: 668 PSI Second Final Flow Pressure: 1087 PSI Final Shut-in Pressure: 1741 PSI Final Hydro Pressure: 2295 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 358 ft. Drill Pipe Length: 4451 ft. |
Initial Flow: Strong blow bottom of bucket in 2.5 mins. Initial Shut-in: Weak blow. (1/4"") Final Flow: Strong blow bottom of bucket in 4.25 mins. Final Shut-in: No blow |
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 20 Samples: Gas Recovery: Comments: | |
Recovery 2160 of Total Fluid 358 of Fluid in Drill Collars 2102 of Fluid in Drill Pipe 120 of Gas cut muddy water 5% gas 45% mud 50% water 2040 of Gas and mud cut water 8% gas 2% mud 90% water 140000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5008 to 5040
Formation tested: Marmaton | Date, Time: 24-FEB-99; 15:28:11 |
Initial Hydro Pressure: 2419 PSI
First Initial Flow Pressure: 39 PSI First Final Flow Pressure: 167 PSI Initial Shut-in Pressure: 1776 PSI Second Initial Flow Pressure: 179 PSI Second Final Flow Pressure: 331 PSI Final Shut-in Pressure: 1743 PSI Final Hydro Pressure: 2372 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 358 ft. Drill Pipe Length: 4637 ft. |
Initial Flow: Fair to strong blow bottom of bucket in 8 mins. Initial Shut-in: No blow. Final Flow: Fair to strong blow bottom of bucket in 24 mins. Final Shut-in: No blow |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 12 Samples: Gas Recovery: Comments: | |
Recovery 560 of Total Fluid 358 of Fluid in Drill Collars 202 of Fluid in Drill Pipe 185 of Gas in pipe. 90 of Oil cut watery mud 3% Oil 17% Water 80% Mud 470 of Gassy salt water 5% Gas 95% Water 104000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5064 to 5076
Formation tested: Pawnee | Date, Time: 25-FEB-99; 09:43:20 |
Initial Hydro Pressure: 2475 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 88 PSI Initial Shut-in Pressure: 1773 PSI Second Initial Flow Pressure: 94 PSI Second Final Flow Pressure: 144 PSI Final Shut-in Pressure: 1750 PSI Final Hydro Pressure: 2439 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 358 ft. Drill Pipe Length: 4701 ft. |
Initial Flow: Strong blow bottom of bucket in 4 mins. Initial Shut-in: No blow. Final Flow: Fair to strong blow bottom of bucket in 20 mins. Final Shut-in: No bow |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
Recovery 260 of Total Fluid 260 of Fluid in Drill Collars 80 of Gas cut mud 8% gas 92% mud 180 of Muddy water 10% mud 90% water 84000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5089 to 5116
Formation tested: Ft. Scott | Date, Time: 26-FEB-99; 03:42:55 |
Initial Hydro Pressure: 2474 PSI
First Initial Flow Pressure: 43 PSI First Final Flow Pressure: 58 PSI Initial Shut-in Pressure: 1877 PSI Second Initial Flow Pressure: 43 PSI Second Final Flow Pressure: 66 PSI Final Shut-in Pressure: 1871 PSI Final Hydro Pressure: 2474 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 358 ft. Drill Pipe Length: 4701 ft. |
Initial Flow: Strong blow gas to surface in 5 mins. See gas volume report Initial Shut-in Weak blow. Final Flow: Strong blow See gas volume report Final Shut-in: Weak blow |
|
Bottom Hole Temperature: 107 DEG F
Percent Porosity: 11 Samples: gas sample Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling mud 7000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 5210 to 5267
Formation tested: Miss. | Date, Time: 27-FEB-99; 15:49:23 |
Initial Hydro Pressure: 2546 PSI
First Initial Flow Pressure: 44 PSI First Final Flow Pressure: 49 PSI Initial Shut-in Pressure: 1593 PSI Second Initial Flow Pressure: 50 PSI Second Final Flow Pressure: 57 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2515 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 358 ft. Drill Pipe Length: 4828 ft. |
Initial Flow: Strong blow gas to surface in 9.5 mins. see gas volume report Initial Shut-in: Weak blow. Final Flow: Strong blow see gas volume report Final Shut-in: Weak blow |
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 10 Samples: gas sample Gas Recovery: Comments: | |
Recovery 80 of Total Fluid 80 of Fluid in Drill Collars 80 of Gas cut mud 10% gas 90% mud 7000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |