Drill Stem Tests Database
Specific Well--15-033-21012
API: 15-033-21012
Operator: Hummon Corp.
Field: Nescatunga
Lease: Reynolds
Well 1-28
Location: T32S R18W, Sec. 28, SE SW NE
2988 North, 1682 West, from SE corner
Longitude: -99.2791082
Latitude: 37.2309539
County: Comanche
Status: O&G
Spud Date: 11-MAY-99
Completion Date: 26-MAY-99
Plugging Date:
Total Depth: 5875
Form. at depth: VIOLA
Elevation: 2096 KB
all Log-Tech elogs, Drill Time & Sample originally mismarked 2093 KB. --cb 1/28/02
Test Number: 2 Data Source: TRILOBITE
Interval: 5027 to 5096
Formation tested: Altamont
Date, Time: 19-MAY-99; 14:22:22
Initial Hydro Pressure: 2393 PSI
First Initial Flow Pressure: 35 PSI
First Final Flow Pressure: 50 PSI
Initial Shut-in Pressure: 1664 PSI
Second Initial Flow Pressure: 67 PSI
Second Final Flow Pressure: 87 PSI
Final Shut-in Pressure: 1757 PSI
Final Hydro Pressure: 2396 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 290 ft.
Drill Pipe Length: 4734 ft.
Initial Flow: Strong blow bottom of bucket in 5 1/2 mins. Initial Shut-in: Weak blow. (1/2"")
Final Flow: Strong blow bottom of bucket in 2 secs. gas to surface in 50 mins. (see gas volume report)
Final Shut-in: No blow
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 12
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Collars
130 of Drilling mud
5000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5148 to 5205
Formation tested: Miss.
Date, Time: 20-MAY-99; 14:00:14
Initial Hydro Pressure: 2526 PSI
First Initial Flow Pressure: 185 PSI
First Final Flow Pressure: 128 PSI
Initial Shut-in Pressure: 1670 PSI
Second Initial Flow Pressure: 248 PSI
Second Final Flow Pressure: 131 PSI
Final Shut-in Pressure: 1670 PSI
Final Hydro Pressure: 2493 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 290 ft.
Drill Pipe Length: 4859 ft.
Initial Flow: Strong blow gas to surface in 3 mins. (see gas volume report) Initial Shut-in: Weak blow. (1 - 3"")
Final Flow: Strong blow (see gas volume report)
Final Shut-in: No blow
Bottom Hole Temperature: 124 DEG F
Percent Porosity: 20
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Collars
70 of Drilling mud 10% water 90% mud
120 of Watery mud 14% water 86% mud
14000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5209 to 5245
Formation tested: Miss
Date, Time: 21-MAY-99; 10:05:19
Initial Hydro Pressure: 2529 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 1572 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2513 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 295 ft.
Drill Pipe Length: 4915 ft.
IF:Weak surface blow. ISI:No blow back. FF:Pull tool.
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Collars
70 of Very slight gas cut mud 99%mud 1%gas
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4701 to 4731
Formation tested: Drum
Date, Time: 18-MAY-99; 02:43:03
Initial Hydro Pressure: 2246 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 179 PSI
Initial Shut-in Pressure: 1694 PSI
Second Initial Flow Pressure: 183 PSI
Second Final Flow Pressure: 261 PSI
Final Shut-in Pressure: 1691 PSI
Final Hydro Pressure: 2236 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 290 ft.
Drill Pipe Length: 4422 ft.
Initial Flow: Fair to strong blow bottom of bucket in 23 mins. Initial Shut-in: No blow.
Final Flow: Weak to fair blow slow increase to 10 ""
Final Shut-in: No blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 14
Samples: none
Gas Recovery:
Comments:
Recovery
440 of Total Fluid
290 of Fluid in Drill Collars
150 of Fluid in Drill Pipe
90 of Muddy water 20% mud 80% water
350 of Salt water.
132000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.