Drill Stem Tests Database
Specific Well--15-025-21181
API: 15-025-21181
Operator:
Field: Wildcat
Lease: AMOS
Well 1-30
Location: T34S R24W, Sec. 30, W2 NW NW
4681 North, 4848 West, from SE corner
Longitude: -99.9770722
Latitude: 37.0616095
County: Clark
Status: GAS
Spud Date: 25-MAR-99
Completion Date: 25-JUN-99
Plugging Date:
Total Depth: 6020
Form. at depth: MISSISSIPPIAN
Elevation: 2006 GL
Test Number: 1 Data Source: TRILOBITE
Interval: 5622 to 5696
Formation tested: Morrow & Chester
Date, Time: 02-APR-99; 06:04:39
Initial Hydro Pressure: 2906 PSI
First Initial Flow Pressure: 67 PSI
First Final Flow Pressure: 86 PSI
Initial Shut-in Pressure: 1660 PSI
Second Initial Flow Pressure: 85 PSI
Second Final Flow Pressure: 114 PSI
Final Shut-in Pressure: 1723 PSI
Final Hydro Pressure: 2708 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 359 ft.
Drill Pipe Length: 5317 ft.
Initial Flow: Strong blow bottom of bucket in 1 min. Gas to surface in 25 mins.
Final Flow: Strong blow bottom of bucket as soon as open tool MCF @ 28.0
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10
Samples: Yes 1
Gas Recovery:
Comments:
Recovery
300 of Total Fluid
300 of Fluid in Drill Collars
300 of Drilling mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5698 to 5785
Formation tested: Chester
Date, Time: 03-APR-99; 05:55:34
Initial Hydro Pressure: 2867 PSI
First Initial Flow Pressure: 39 PSI
First Final Flow Pressure: 75 PSI
Initial Shut-in Pressure: 1368 PSI
Second Initial Flow Pressure: 95 PSI
Second Final Flow Pressure: 118 PSI
Final Shut-in Pressure: 1433 PSI
Final Hydro Pressure: 2730 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 359 ft.
Drill Pipe Length: 5381 ft.
Initial Flow: Weak blow built 1""
Final Flow: Weak blow built to .25"" died in 17 mins.
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Collars
120 of Muddy water 50%Mud 50%Water
90 of Muddy water 40%Mud 60%Water
15000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.