|
API: 15-033-21009
Operator: DAYSTAR PETROLEUM INC./ KFG RESOURCES Field: Colter Lease: Lousch 'B' Well 1 |
Location: T33S R18W, Sec. 6, SE NE SW NW
1697 South, 1284 East, from NW corner Longitude: -99.3228946 Latitude: 37.2031122 County: Comanche Status: GAS-P&A |
Spud Date: 05-MAY-99
Completion Date: 18-JUN-99 Plugging Date: 29-MAR-19 Total Depth: 5935 Form. at depth: VIOLA Elevation: 2072 KB |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 5816 to 5861
Formation tested: Viola | Date, Time: 19-MAY-99; 10:24:58 |
|
Initial Hydro Pressure: 2881 PSI
First Initial Flow Pressure: 45 PSI First Final Flow Pressure: 35 PSI Initial Shut-in Pressure: 1060 PSI Second Initial Flow Pressure: 27 PSI Second Final Flow Pressure: 38 PSI Final Shut-in Pressure: 921 PSI Final Hydro Pressure: 2819 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 5565 ft. |
|
Initial Flow: Strong-bottom of bucket in 45 sec. Final Flow: Strong-bottom of bucket in 15 sec |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: IF Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Collars 90 of Gassy mud 10% gas 90% mud | |
| View Pressures | View Recovery Gas |
| Test Number: 6 | Data Source: TRILOBITE |
|
Interval: 5864 to 5935
Formation tested: Viola (middle) | Date, Time: 19-MAY-99; 14:09:42 |
|
Initial Hydro Pressure: 2934 PSI
First Initial Flow Pressure: 34 PSI First Final Flow Pressure: 38 PSI Initial Shut-in Pressure: 63 PSI Second Initial Flow Pressure: 43 PSI Second Final Flow Pressure: 45 PSI Final Shut-in Pressure: 63 PSI Final Hydro Pressure: 2857 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 5626 ft. |
|
Initial Flow: Weak steady 1/8"" blow Final Flow: No blow |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4714 to 4738
Formation tested: Upper Drum | Date, Time: 12-MAY-99; 02:35:29 |
|
Initial Hydro Pressure: 2268 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 98 PSI Initial Shut-in Pressure: 1349 PSI Second Initial Flow Pressure: 114 PSI Second Final Flow Pressure: 200 PSI Final Shut-in Pressure: 1328 PSI Final Hydro Pressure: 2293 PSI |
Tool Data Hole Size: 7.8 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.88 in. Drill Collar Length: 240 ft. Drill Pipe Length: 4475 ft. |
|
Initial Flow: Strong-bottom of bucket in 30 sec. Final Flow: Strong-bottom of bucket in 30 sec |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 461 of Total Fluid 240 of Fluid in Drill Collars 221 of Fluid in Drill Pipe 97 of Gassy Mud 40% gas 60% mud 364 of Muddy water 90% water 10% mud 23000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4826 to 4845
Formation tested: Swope | Date, Time: 13-MAY-99; 05:12:57 |
|
Initial Hydro Pressure: 2424 PSI
First Initial Flow Pressure: 159 PSI First Final Flow Pressure: 406 PSI Initial Shut-in Pressure: 1244 PSI Second Initial Flow Pressure: 283 PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: 1248 PSI Final Hydro Pressure: 2287 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 4569 ft. |
|
Initial Flow: Strong-bottom of bucket in 20 sec. Final Flow: Strong-bottom of bucket in 1 min |
|
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: IF- Gas Recovery: Comments: | |
|
Recovery 999 of Total Fluid 240 of Fluid in Drill Collars 759 of Fluid in Drill Pipe 77 of Gassy mud 30% gas 70% mud 310 of Muddy water 75% water 25% mud 612 of Water 100% water 10000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5093 to 5136
Formation tested: Pawnee/Ft. Scott | Date, Time: 14-MAY-99; 15:55:08 |
|
Initial Hydro Pressure: 2534 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 1842 PSI Second Initial Flow Pressure: 29 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 1842 PSI Final Hydro Pressure: 2518 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 4853 ft. |
|
Initial Flow: Strong-bottom of bucket in 1 min Final Flow: Strong-bottom of bucket in 20 sec Gas to surface as soon as tool opened |
|
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 120 of Total Fluid 120 of Fluid in Drill Collars 120 of Gassy mud 20% gas 80% mud | |
| View Pressures | View Recovery Gas |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 5204 to 5244
Formation tested: Miss | Date, Time: 15-MAY-99; 12:39:01 |
|
Initial Hydro Pressure: 2581 PSI
First Initial Flow Pressure: 87 PSI First Final Flow Pressure: 41 PSI Initial Shut-in Pressure: 1349 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 47 PSI Final Shut-in Pressure: 1126 PSI Final Hydro Pressure: 2527 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 4966 ft. |
|
Initial Flow: Strong-bottom of bucket in 20 sec Final Flow: Strong-bottom of bucket in 10 sec |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: FF Gas Recovery: Comments: | |
|
Recovery 180 of Total Fluid 180 of Fluid in Drill Collars 180 of Gassy mud 20% gas 80% mud | |
| View Pressures | View Recovery Gas |