Drill Stem Tests Database
Specific Well--15-033-21009
API: 15-033-21009
Operator: DAYSTAR PETROLEUM INC./ KFG RESOURCES
Field: Colter
Lease: Lousch 'B'
Well 1
Location: T33S R18W, Sec. 6, SE NE SW NW
1697 South, 1284 East, from NW corner
Longitude: -99.3228946
Latitude: 37.2031122
County: Comanche
Status: GAS-P&A
Spud Date: 05-MAY-99
Completion Date: 18-JUN-99
Plugging Date: 29-MAR-19
Total Depth: 5935
Form. at depth: VIOLA
Elevation: 2072 KB

Download DST Test Data

Test Number: 5 Data Source: TRILOBITE
Interval: 5816 to 5861
Formation tested: Viola
Date, Time: 19-MAY-99; 10:24:58
Initial Hydro Pressure: 2881 PSI
First Initial Flow Pressure: 45 PSI
First Final Flow Pressure: 35 PSI
Initial Shut-in Pressure: 1060 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 38 PSI
Final Shut-in Pressure: 921 PSI
Final Hydro Pressure: 2819 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 5565 ft.
Initial Flow: Strong-bottom of bucket in 45 sec.
Final Flow: Strong-bottom of bucket in 15 sec
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples: IF
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
90 of Gassy mud 10% gas 90% mud
View Pressures View Recovery Gas
 
Test Number: 6 Data Source: TRILOBITE
Interval: 5864 to 5935
Formation tested: Viola (middle)
Date, Time: 19-MAY-99; 14:09:42
Initial Hydro Pressure: 2934 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 38 PSI
Initial Shut-in Pressure: 63 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 63 PSI
Final Hydro Pressure: 2857 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 5626 ft.
Initial Flow: Weak steady 1/8"" blow
Final Flow: No blow
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of Drilling mud
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4714 to 4738
Formation tested: Upper Drum
Date, Time: 12-MAY-99; 02:35:29
Initial Hydro Pressure: 2268 PSI
First Initial Flow Pressure: 37 PSI
First Final Flow Pressure: 98 PSI
Initial Shut-in Pressure: 1349 PSI
Second Initial Flow Pressure: 114 PSI
Second Final Flow Pressure: 200 PSI
Final Shut-in Pressure: 1328 PSI
Final Hydro Pressure: 2293 PSI
Tool Data
Hole Size: 7.8 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.88 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4475 ft.
Initial Flow: Strong-bottom of bucket in 30 sec.
Final Flow: Strong-bottom of bucket in 30 sec
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
461 of Total Fluid
240 of Fluid in Drill Collars
221 of Fluid in Drill Pipe
97 of Gassy Mud 40% gas 60% mud
364 of Muddy water 90% water 10% mud
23000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4826 to 4845
Formation tested: Swope
Date, Time: 13-MAY-99; 05:12:57
Initial Hydro Pressure: 2424 PSI
First Initial Flow Pressure: 159 PSI
First Final Flow Pressure: 406 PSI
Initial Shut-in Pressure: 1244 PSI
Second Initial Flow Pressure: 283 PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: 1248 PSI
Final Hydro Pressure: 2287 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4569 ft.
Initial Flow: Strong-bottom of bucket in 20 sec.
Final Flow: Strong-bottom of bucket in 1 min
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: IF-
Gas Recovery:
Comments:
Recovery
999 of Total Fluid
240 of Fluid in Drill Collars
759 of Fluid in Drill Pipe
77 of Gassy mud 30% gas 70% mud
310 of Muddy water 75% water 25% mud
612 of Water 100% water
10000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5093 to 5136
Formation tested: Pawnee/Ft. Scott
Date, Time: 14-MAY-99; 15:55:08
Initial Hydro Pressure: 2534 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 1842 PSI
Second Initial Flow Pressure: 29 PSI
Second Final Flow Pressure: 37 PSI
Final Shut-in Pressure: 1842 PSI
Final Hydro Pressure: 2518 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4853 ft.
Initial Flow: Strong-bottom of bucket in 1 min
Final Flow: Strong-bottom of bucket in 20 sec Gas to surface as soon as tool opened
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of Gassy mud 20% gas 80% mud
View Pressures View Recovery Gas
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5204 to 5244
Formation tested: Miss
Date, Time: 15-MAY-99; 12:39:01
Initial Hydro Pressure: 2581 PSI
First Initial Flow Pressure: 87 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 1349 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 47 PSI
Final Shut-in Pressure: 1126 PSI
Final Hydro Pressure: 2527 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4966 ft.
Initial Flow: Strong-bottom of bucket in 20 sec
Final Flow: Strong-bottom of bucket in 10 sec
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples: FF
Gas Recovery:
Comments:
Recovery
180 of Total Fluid
180 of Fluid in Drill Collars
180 of Gassy mud 20% gas 80% mud
View Pressures View Recovery Gas