Drill Stem Tests Database
Specific Well--15-033-21014
API: 15-033-21014
Operator: CLX Energy, Inc.
Field: Coldwater
Lease: Acres
Well 1
Location: T32S R18W, Sec. 21, N2 S2 NW
3554 North, 3974 West, from SE corner
Longitude: -99.2871143
Latitude: 37.2470389
County: Comanche
Status: GAS
Spud Date: 24-MAY-99
Completion Date: 26-JUN-99
Plugging Date:
Total Depth: 5550
Form. at depth: MISSISSIPPIAN
Elevation: 2124 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4359 to 4370
Formation tested: Douglas
Date, Time: 30-MAY-99; 01:15:32
Initial Hydro Pressure: 2135 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 57 PSI
Initial Shut-in Pressure: 1572 PSI
Second Initial Flow Pressure: 68 PSI
Second Final Flow Pressure: 143 PSI
Final Shut-in Pressure: 1563 PSI
Final Hydro Pressure: 2058 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4117 ft.
Initial Flow: Strong blow bottom of bucket in 10 secs. gas to surface in 15 mins. (see gas volume report) Initial Shut-in: No blow
Final Flow: Strong blow. (see gas volume report)
Final Shut-in: Weak blow
Bottom Hole Temperature: 106 DEG F
Percent Porosity: 15
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
125 of Drilling mud
5000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4794 to 4825
Formation tested: Swope
Date, Time: 31-MAY-99; 13:43:40
Initial Hydro Pressure: 2338 PSI
First Initial Flow Pressure: 97 PSI
First Final Flow Pressure: 140 PSI
Initial Shut-in Pressure: 1748 PSI
Second Initial Flow Pressure: 152 PSI
Second Final Flow Pressure: 159 PSI
Final Shut-in Pressure: 1738 PSI
Final Hydro Pressure: 2295 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4546 ft.
Initial Flow: Strong blow gas to surface in 3 mins. (see gas volume report) Initial Shut-in: Weak blow.
Final Flow: Strong blow (see gas volume report)
Final Shut-in: Weak blow
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 20
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
195 of Total Fluid
195 of Fluid in Drill Collars
195 of Gas cut mud 2% gas 12% water 86% mud
9200 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5010 to 5042
Formation tested: Altamont
Date, Time: 01-JUN-99; 20:01:43
Initial Hydro Pressure: 2436 PSI
First Initial Flow Pressure: 62 PSI
First Final Flow Pressure: 64 PSI
Initial Shut-in Pressure: 1827 PSI
Second Initial Flow Pressure: 96 PSI
Second Final Flow Pressure: 75 PSI
Final Shut-in Pressure: 1801 PSI
Final Hydro Pressure: 2402 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4765 ft.
Initial Flow: Strong blow gas to surface in 7 mins. (see gas volume report Initial Shut-in: Weak blow.
Final Flow: Strong blow (see gas volume report)
Final Shut-in: Weak blow 1/2""
Bottom Hole Temperature: 110 DEG F
Percent Porosity: 14
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
175 of Total Fluid
175 of Fluid in Drill Collars
115 of Gas cut mud 5% gas 5% water 90% mud
60 of Gas cut mud with oil specs.
8000 of Salinity (PPM)
View Pressures View Recovery Gas