|
API: 15-033-21014
Operator: CLX Energy, Inc. Field: Coldwater Lease: Acres Well 1 |
Location: T32S R18W, Sec. 21, N2 S2 NW
3554 North, 3974 West, from SE corner Longitude: -99.2871143 Latitude: 37.2470389 County: Comanche Status: GAS |
Spud Date: 24-MAY-99
Completion Date: 26-JUN-99 Plugging Date: Total Depth: 5550 Form. at depth: MISSISSIPPIAN Elevation: 2124 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4359 to 4370
Formation tested: Douglas | Date, Time: 30-MAY-99; 01:15:32 |
|
Initial Hydro Pressure: 2135 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 57 PSI Initial Shut-in Pressure: 1572 PSI Second Initial Flow Pressure: 68 PSI Second Final Flow Pressure: 143 PSI Final Shut-in Pressure: 1563 PSI Final Hydro Pressure: 2058 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 236 ft. Drill Pipe Length: 4117 ft. |
|
Initial Flow: Strong blow bottom of bucket in 10 secs. gas to surface in 15 mins. (see gas volume report) Initial Shut-in: No blow Final Flow: Strong blow. (see gas volume report) Final Shut-in: Weak blow |
|
|
Bottom Hole Temperature: 106 DEG F
Percent Porosity: 15 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 125 of Total Fluid 125 of Fluid in Drill Collars 125 of Drilling mud 5000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4794 to 4825
Formation tested: Swope | Date, Time: 31-MAY-99; 13:43:40 |
|
Initial Hydro Pressure: 2338 PSI
First Initial Flow Pressure: 97 PSI First Final Flow Pressure: 140 PSI Initial Shut-in Pressure: 1748 PSI Second Initial Flow Pressure: 152 PSI Second Final Flow Pressure: 159 PSI Final Shut-in Pressure: 1738 PSI Final Hydro Pressure: 2295 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 236 ft. Drill Pipe Length: 4546 ft. |
|
Initial Flow: Strong blow gas to surface in 3 mins. (see gas volume report) Initial Shut-in: Weak blow. Final Flow: Strong blow (see gas volume report) Final Shut-in: Weak blow |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 20 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 195 of Total Fluid 195 of Fluid in Drill Collars 195 of Gas cut mud 2% gas 12% water 86% mud 9200 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5010 to 5042
Formation tested: Altamont | Date, Time: 01-JUN-99; 20:01:43 |
|
Initial Hydro Pressure: 2436 PSI
First Initial Flow Pressure: 62 PSI First Final Flow Pressure: 64 PSI Initial Shut-in Pressure: 1827 PSI Second Initial Flow Pressure: 96 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: 1801 PSI Final Hydro Pressure: 2402 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 236 ft. Drill Pipe Length: 4765 ft. |
|
Initial Flow: Strong blow gas to surface in 7 mins. (see gas volume report Initial Shut-in: Weak blow. Final Flow: Strong blow (see gas volume report) Final Shut-in: Weak blow 1/2"" |
|
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: 14 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 175 of Total Fluid 175 of Fluid in Drill Collars 115 of Gas cut mud 5% gas 5% water 90% mud 60 of Gas cut mud with oil specs. 8000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |