Drill Stem Tests Database
Specific Well--15-033-21022
API: 15-033-21022
Operator: Hummon Corp.
Field: Nescatunga
Lease: Owens
Well 1-28
Location: T32S R18W, Sec. 28, S2 NW
3303 North, 4008 West, from SE corner
Longitude: -99.2871054
Latitude: 37.2317732
County: Comanche
Status: O&G
Spud Date: 08/02/1999
Completion Date: 08/14/1999
Plugging Date:
Total Depth: 5234
Form. at depth: MISSISSIPPIAN
Elevation: 2113 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5045 to 5062
Formation tested: Altamont
Date, Time: 08/10/1999; 15:48:49
Initial Hydro Pressure: 2437 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 1368 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 29 PSI
Final Shut-in Pressure: 1056 PSI
Final Hydro Pressure: 2422 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4795 ft.
Initial Flow: Very weak surface blow died in 12 mins. Initial Shut-in: No blow.
Final Flow: No blow flushed tool 10 mins. into
Final Flow no blow
Final Shut-in: No blow `
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Heavy mud.
5000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5119 to 5140
Formation tested: FT.Scott
Date, Time: 08/11/1999; 20:25:22
Initial Hydro Pressure: 2372 PSI
First Initial Flow Pressure: 109 PSI
First Final Flow Pressure: 91 PSI
Initial Shut-in Pressure: 1745 PSI
Second Initial Flow Pressure: 130 PSI
Second Final Flow Pressure: 81 PSI
Final Shut-in Pressure: 1835 PSI
Final Hydro Pressure: 2433 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4890 ft.
Initial Flow: Strong blow gas to surface in 2 1/2 mins. (see gas volume report) Initial Shut-in: Strong blow throughout
Final Flow: Strong blow (see gas volume report)
Final Shut-in: Weak blow 2-3""
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 16
Samples: gas sample
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Heavy mud.
5000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5170 to 5224
Formation tested: Miss.
Date, Time: 08/12/1999; 17:09:16
Initial Hydro Pressure: 2566 PSI
First Initial Flow Pressure: 117 PSI
First Final Flow Pressure: 81 PSI
Initial Shut-in Pressure: 1627 PSI
Second Initial Flow Pressure: 108 PSI
Second Final Flow Pressure: 60 PSI
Final Shut-in Pressure: 1537 PSI
Final Hydro Pressure: 2473 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4921 ft.
Initial Flow: Strong blow gas to surface in 4.5 mins. (see gas volume report) Initial Shut-in: Weak blow. 1/2 - 1""
Final Flow: Strong blow (see gas volumre report)
Final Shut-in: Weak blow 1/2-2""
Bottom Hole Temperature: 114 DEG F
Percent Porosity: 16
Samples: gas sample
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
90 of Drilling mud
7000 of Salinity (PPM)
View Pressures View Recovery Gas