|
API: 15-051-25008
Operator: HAL C. PORTER Field: Zerfas East Lease: Solomon, Terry Well 32-2 |
Location: T11S R19W, Sec. 32, SE SW NW
2270 South, 1250 East, from NW corner Longitude: -99.4591128 Latitude: 39.053359 County: Ellis Status: D&A |
Spud Date: 06-AUG-99
Completion Date: 12-AUG-99 Plugging Date: 12-AUG-99 Total Depth: 3741 Form. at depth: ARBUCKLE Elevation: 2105 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3665 to 3675
Formation tested: Arbuckle | Date, Time: 10-AUG-99; 09:08:13 |
|
Initial Hydro Pressure: 1822 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 662 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 27 PSI Final Shut-in Pressure: 722 PSI Final Hydro Pressure: 1800 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3130 ft. |
|
Initial Flow: Very weak blow died in 12 mins. Final Flow: No blow |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Oil cut mud 8%oil 92%mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3665 to 3681
Formation tested: Arbuckle | Date, Time: 10-AUG-99; 19:05:45 |
|
Initial Hydro Pressure: 1847 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 945 PSI Second Initial Flow Pressure: 25 PSI Second Final Flow Pressure: 34 PSI Final Shut-in Pressure: 1051 PSI Final Hydro Pressure: 1780 PSI |
Tool Data Hole Size: 6.75 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3130 ft. |
|
Initial Flow: Very weak surface blow throughout Final Flow: No blow |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 12 of Total Fluid 12 of Fluid in Drill Collars 2 of Clean oil 10 of Heavy oil cut mud 20%oil 80%mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3674 to 3686
Formation tested: Arbuckle | Date, Time: 11-AUG-99; 07:28:15 |
|
Initial Hydro Pressure: 1839 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 1034 PSI Second Initial Flow Pressure: 30 PSI Second Final Flow Pressure: 42 PSI Final Shut-in Pressure: 987 PSI Final Hydro Pressure: 1795 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3161 ft. |
|
Initial Flow: Weak blow throughout 1/4"" to 1"" blow Final Flow: Weak blow throughout 1/4"" to 1/2"" blow |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 65 of Total Fluid 65 of Fluid in Drill Collars 25 of clean oil 40 of Oil cut mud 10%oil 90%mud 29 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 3681 to 3694
Formation tested: Arbuckle | Date, Time: 11-AUG-99; 19:58:53 |
|
Initial Hydro Pressure: 1844 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 44 PSI Initial Shut-in Pressure: 1117 PSI Second Initial Flow Pressure: 44 PSI Second Final Flow Pressure: 79 PSI Final Shut-in Pressure: 1138 PSI Final Hydro Pressure: 1799 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3161 ft. |
|
Initial Flow: Very weak surface blow throughout Final Flow: Weak building blow 1/4"" to 3"" blow |
|
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 140 of Total Fluid 140 of Fluid in Drill Collars 140 of Muddy water 20%mud 80%water 22000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |