API: 15-081-21234
Operator: Harris Oil & Gas Company Field: Victory Lease: SCHNELLBACHER PC Well 3-523 |
Location: T30S R34W, Sec. 23, NE SW NW
1650 South, 990 East, from NW corner Longitude: -101.0128783 Latitude: 37.4269208 County: Haskell Status: GAS |
Spud Date: 26-MAR-99
Completion Date: 28-APR-99 Plugging Date: Total Depth: 5590 Form. at depth: MISSISSIPPIAN Elevation: 2963 KB |
DST mismarked R3W, 3064 KB. --cb 11/6/01 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5196 to 5180
Formation tested: morrow | Date, Time: 04-APR-99; 08:27:59 |
Initial Hydro Pressure: 2529 PSI
First Initial Flow Pressure: 323 PSI First Final Flow Pressure: 325 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2493 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 547 ft. Drill Pipe Length: 4715 ft. |
Initial Flow: Bottom of bucket at open gas to surface in 3 1/2 mins. Initial Shut-in: Can't turn piped to shut-in tool reset, still wouldn't turn pull tool out of hole | |
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: gas Gas Recovery: Comments: | |
Recovery 440 of Total Fluid 440 of Fluid in Drill Collars 65 of slitly gassy drilg mud 10%gas 90%mud 375 of gassy drilg mud 25%gas 75%mud 1800 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5196 to 5280
Formation tested: morrow | Date, Time: 04-APR-99; 15:54:54 |
Initial Hydro Pressure: 2544 PSI
First Initial Flow Pressure: 316 PSI First Final Flow Pressure: 322 PSI Initial Shut-in Pressure: 353 PSI Second Initial Flow Pressure: 317 PSI Second Final Flow Pressure: 325 PSI Final Shut-in Pressure: 351 PSI Final Hydro Pressure: 2464 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 547 ft. Drill Pipe Length: 4715 ft. |
Initial Flow: Bottom of bucket at open gas to surface in 3 1/2 mins. Initial Shut-in: Bleed off for 20 mins. weak return in 5 mins. dead in 12 mins. Final Flow: Gauging as at open Final Shut-in: Bleed off for 20 mins. weak return in 7 mins. died in 20 mins. |
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: Samples: gas Gas Recovery: Comments: | |
Recovery 250 of Total Fluid 250 of Fluid in Drill Collars 70 of slitly gassy mud 8%gas 92%mud 180 of gassy mud 30% gas 70% mud 1800 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |