Drill Stem Tests Database
Specific Well--15-081-21234
API: 15-081-21234
Operator: Harris Oil & Gas Company
Field: Victory
Lease: SCHNELLBACHER PC
Well 3-523
Location: T30S R34W, Sec. 23, NE SW NW
1650 South, 990 East, from NW corner
Longitude: -101.0128783
Latitude: 37.4269208
County: Haskell
Status: GAS
Spud Date: 26-MAR-99
Completion Date: 28-APR-99
Plugging Date:
Total Depth: 5590
Form. at depth: MISSISSIPPIAN
Elevation: 2963 KB
DST mismarked R3W, 3064 KB. --cb 11/6/01

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5196 to 5180
Formation tested: morrow
Date, Time: 04-APR-99; 08:27:59
Initial Hydro Pressure: 2529 PSI
First Initial Flow Pressure: 323 PSI
First Final Flow Pressure: 325 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2493 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 547 ft.
Drill Pipe Length: 4715 ft.
Initial Flow: Bottom of bucket at open gas to surface in 3 1/2 mins. Initial Shut-in: Can't turn piped to shut-in tool reset, still wouldn't turn pull tool out of hole
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples: gas
Gas Recovery:
Comments:
Recovery
440 of Total Fluid
440 of Fluid in Drill Collars
65 of slitly gassy drilg mud 10%gas 90%mud
375 of gassy drilg mud 25%gas 75%mud
1800 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5196 to 5280
Formation tested: morrow
Date, Time: 04-APR-99; 15:54:54
Initial Hydro Pressure: 2544 PSI
First Initial Flow Pressure: 316 PSI
First Final Flow Pressure: 322 PSI
Initial Shut-in Pressure: 353 PSI
Second Initial Flow Pressure: 317 PSI
Second Final Flow Pressure: 325 PSI
Final Shut-in Pressure: 351 PSI
Final Hydro Pressure: 2464 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 547 ft.
Drill Pipe Length: 4715 ft.
Initial Flow: Bottom of bucket at open gas to surface in 3 1/2 mins. Initial Shut-in: Bleed off for 20 mins. weak return in 5 mins. dead in 12 mins.
Final Flow: Gauging as at open
Final Shut-in: Bleed off for 20 mins. weak return in 7 mins. died in 20 mins.
Bottom Hole Temperature: 132 DEG F
Percent Porosity:
Samples: gas
Gas Recovery:
Comments:
Recovery
250 of Total Fluid
250 of Fluid in Drill Collars
70 of slitly gassy mud 8%gas 92%mud
180 of gassy mud 30% gas 70% mud
1800 of Salinity (PPM)
View Pressures View Recovery Gas