|
API: 15-081-21250
Operator: OXY USA, INC. Field: Pleasant Prairie Southeast Lease: FREY 'F' Well 1 |
Location: T27S R34W, Sec. 13, NW NE SE NE
1382 South, 520 West, from NE corner Longitude: -100.9815786 Latitude: 37.7037993 County: Haskell Status: OIL |
Spud Date: 08/28/1999
Completion Date: 09/10/1999 Plugging Date: Total Depth: 5370 Form. at depth: CHESTER Elevation: 2991 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5135 to 5152
Formation tested: Morrow | Date, Time: 09/07/1999; 01:30:14 |
|
Initial Hydro Pressure: 2465 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 80 PSI Initial Shut-in Pressure: 1382 PSI Second Initial Flow Pressure: 90 PSI Second Final Flow Pressure: 189 PSI Final Shut-in Pressure: 1367 PSI Final Hydro Pressure: 2440 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 643 ft. Drill Pipe Length: 4474 ft. |
|
Initial flow: Surface blow built to 1"" in 5 min. Decreased to 3/4"" in 30 min. Initial Shut-in: No blow-back. Final Flow: Surface blow throughout. Final Shut-in: No blow-back. Remarks: Est. 17 ft. of pay. |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 16 Samples: None Gas Recovery: Comments: | |
|
Recovery 310 of Total Fluid 310 of Fluid in Drill Collars 30 of Mud cut Water 30% Mud 70% Water 280 of Water 100% Water 27000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5145 to 5165
Formation tested: Morrow | Date, Time: 09/08/1999; 20:45:07 |
|
Initial Hydro Pressure: 2437 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 98 PSI Initial Shut-in Pressure: 1387 PSI Second Initial Flow Pressure: 112 PSI Second Final Flow Pressure: 263 PSI Final Shut-in Pressure: 1346 PSI Final Hydro Pressure: 2427 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 643 ft. Drill Pipe Length: 4480 ft. |
|
Initial Flow: 3 /4"" built to 2"" in 5 min. Decreased to 1 1/4"" in 30 min. Initial Shut-in: No blow-back. Final Flow: Surface blow throughout. Final Shut-in: No blow-back. Remarks: 20 ft. of pay. held. Top RW. 0.88 at 47 F. 10,500 PPM. Middle RW. 0.32 at 52 F. 29,000 PPM. Bottom RW. 0.30 at 52 F. 31,000 PPM. |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 20 Samples: None Gas Recovery: Comments: | |
|
Recovery 480 of Total Fluid 480 of Fluid in Drill Collars 50 of Water cut Mud 36% Water 64% Mud 120 of Mud cut Water 75% Water 25% Mmud 310 of Water 100% Water 31000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |