Drill Stem Tests Database
Specific Well--15-081-21250
API: 15-081-21250
Operator: OXY USA, INC.
Field: Pleasant Prairie Southeast
Lease: FREY 'F'
Well 1
Location: T27S R34W, Sec. 13, NW NE SE NE
1382 South, 520 West, from NE corner
Longitude: -100.9815786
Latitude: 37.7037993
County: Haskell
Status: OIL
Spud Date: 08/28/1999
Completion Date: 09/10/1999
Plugging Date:
Total Depth: 5370
Form. at depth: CHESTER
Elevation: 2991 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5135 to 5152
Formation tested: Morrow
Date, Time: 09/07/1999; 01:30:14
Initial Hydro Pressure: 2465 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 80 PSI
Initial Shut-in Pressure: 1382 PSI
Second Initial Flow Pressure: 90 PSI
Second Final Flow Pressure: 189 PSI
Final Shut-in Pressure: 1367 PSI
Final Hydro Pressure: 2440 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 643 ft.
Drill Pipe Length: 4474 ft.
Initial flow: Surface blow built to 1"" in 5 min. Decreased to 3/4"" in 30 min. Initial Shut-in: No blow-back.
Final Flow: Surface blow throughout.
Final Shut-in: No blow-back. Remarks: Est. 17 ft. of pay.
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 16
Samples: None
Gas Recovery:
Comments:
Recovery
310 of Total Fluid
310 of Fluid in Drill Collars
30 of Mud cut Water 30% Mud 70% Water
280 of Water 100% Water
27000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5145 to 5165
Formation tested: Morrow
Date, Time: 09/08/1999; 20:45:07
Initial Hydro Pressure: 2437 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 98 PSI
Initial Shut-in Pressure: 1387 PSI
Second Initial Flow Pressure: 112 PSI
Second Final Flow Pressure: 263 PSI
Final Shut-in Pressure: 1346 PSI
Final Hydro Pressure: 2427 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 643 ft.
Drill Pipe Length: 4480 ft.
Initial Flow: 3 /4"" built to 2"" in 5 min. Decreased to 1 1/4"" in 30 min. Initial Shut-in: No blow-back.
Final Flow: Surface blow throughout.
Final Shut-in: No blow-back. Remarks: 20 ft. of pay. held. Top RW. 0.88 at 47 F. 10,500 PPM. Middle RW. 0.32 at 52 F. 29,000 PPM. Bottom RW. 0.30 at 52 F. 31,000 PPM.
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 20
Samples: None
Gas Recovery:
Comments:
Recovery
480 of Total Fluid
480 of Fluid in Drill Collars
50 of Water cut Mud 36% Water 64% Mud
120 of Mud cut Water 75% Water 25% Mmud
310 of Water 100% Water
31000 of Salinity (PPM)
View Pressures No Recovery Gas data.