|
API: 15-095-21753
Operator: McCoy Petroleum Corp. Field: Spivey-Grabs-Basil Lease: WHITMER 'S' Well 3-3 |
Location: T30S R9W, Sec. 3, SE NW SW
1650 North, 4290 West, from SE corner Longitude: -98.2962193 Latitude: 37.4613024 County: Kingman Status: GAS |
Spud Date: 18-JUN-99
Completion Date: 02-AUG-99 Plugging Date: Total Depth: 4279 Form. at depth: MISSISSIPPIAN Elevation: 1676 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 2158 to 2179
Formation tested: Howard | Date, Time: 21-JUN-99; 21:28:59 |
|
Initial Hydro Pressure: 1476 PSI
First Initial Flow Pressure: 48 PSI First Final Flow Pressure: 163 PSI Initial Shut-in Pressure: 972 PSI Second Initial Flow Pressure: 178 PSI Second Final Flow Pressure: 242 PSI Final Shut-in Pressure: 941 PSI Final Hydro Pressure: 1397 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 233.14 ft. Drill Pipe Length: ft. |
|
Initial Flow: Strong blow bottom of bucket in 30 secs. Initial Shut-in: Bled down for 5 mins. slight blow back 1/2"" in water Final Flow: Fair blow bottom of bucket in 9 1/2 mins. Final Shut-in: Bled down for 10 mins.Slight blow - back 1/4""in water |
|
|
Bottom Hole Temperature: 105 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 540 of Total Fluid 233 of Fluid in Drill Collars 307 of Fluid in Drill Pipe 60 of Mud cut water 42%mud 58%water 480 of Slight mud cut water 10%mud 90%water 150000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4255 to 4268
Formation tested: Miss | Date, Time: 24-JUN-99; 13:53:21 |
|
Initial Hydro Pressure: 2107 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 54 PSI Initial Shut-in Pressure: 880 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 90 PSI Final Shut-in Pressure: 876 PSI Final Hydro Pressure: 2114 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 233.14 ft. Drill Pipe Length: ft. |
|
Initial Flow: Strong blow bottom of bucket in 30 secs. gas to surface in 8 mins. Initial Shut-in: Bled down for 10 mins. built back to 4"" in water Final Flow; Strong blow bottom of bucket in 10 secs. gauge gas Final Shut-in: Bled down for 10 mins. no blow back |
|
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: Samples: Caraway analytical 1024 n.Roosevelt Gas Recovery: Comments: | |
|
Recovery 145 of Total Fluid 145 of Fluid in Drill Collars 4089 of Gas in pipe 25 of slight gas cut mud 2% gas 985 mud 120 of slight water cut mud 105 water 90% mud 85000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |