Drill Stem Tests Database
Specific Well--15-095-21753
API: 15-095-21753
Operator: McCoy Petroleum Corp.
Field: Spivey-Grabs-Basil
Lease: WHITMER 'S'
Well 3-3
Location: T30S R9W, Sec. 3, SE NW SW
1650 North, 4290 West, from SE corner
Longitude: -98.2962193
Latitude: 37.4613024
County: Kingman
Status: GAS
Spud Date: 18-JUN-99
Completion Date: 02-AUG-99
Plugging Date:
Total Depth: 4279
Form. at depth: MISSISSIPPIAN
Elevation: 1676 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2158 to 2179
Formation tested: Howard
Date, Time: 21-JUN-99; 21:28:59
Initial Hydro Pressure: 1476 PSI
First Initial Flow Pressure: 48 PSI
First Final Flow Pressure: 163 PSI
Initial Shut-in Pressure: 972 PSI
Second Initial Flow Pressure: 178 PSI
Second Final Flow Pressure: 242 PSI
Final Shut-in Pressure: 941 PSI
Final Hydro Pressure: 1397 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 233.14 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 30 secs. Initial Shut-in: Bled down for 5 mins. slight blow back 1/2"" in water
Final Flow: Fair blow bottom of bucket in 9 1/2 mins.
Final Shut-in: Bled down for 10 mins.Slight blow - back 1/4""in water
Bottom Hole Temperature: 105 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
540 of Total Fluid
233 of Fluid in Drill Collars
307 of Fluid in Drill Pipe
60 of Mud cut water 42%mud 58%water
480 of Slight mud cut water 10%mud 90%water
150000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4255 to 4268
Formation tested: Miss
Date, Time: 24-JUN-99; 13:53:21
Initial Hydro Pressure: 2107 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 54 PSI
Initial Shut-in Pressure: 880 PSI
Second Initial Flow Pressure: 40 PSI
Second Final Flow Pressure: 90 PSI
Final Shut-in Pressure: 876 PSI
Final Hydro Pressure: 2114 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 233.14 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 30 secs. gas to surface in 8 mins. Initial Shut-in: Bled down for 10 mins. built back to 4"" in water
Final Flow; Strong blow bottom of bucket in 10 secs. gauge gas
Final Shut-in: Bled down for 10 mins. no blow back
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples: Caraway analytical 1024 n.Roosevelt
Gas Recovery:
Comments:
Recovery
145 of Total Fluid
145 of Fluid in Drill Collars
4089 of Gas in pipe
25 of slight gas cut mud 2% gas 985 mud
120 of slight water cut mud 105 water 90% mud
85000 of Salinity (PPM)
View Pressures View Recovery Gas