|
API: 15-097-21442
Operator: Ritchie Exploration, Inc. Field: Joy Station South Lease: Unruh, A. Well 1 |
Location: T28S R19W, Sec. 29, NW SE
2060 North, 2000 West, from SE corner Longitude: -99.4187386 Latitude: 37.5772301 County: Kiowa Status: D&A |
Spud Date: 26-JUL-99
Completion Date: 05-AUG-99 Plugging Date: 05-AUG-99 Total Depth: 5015 Form. at depth: MISSISSIPPIAN Elevation: 2322 KB |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4940 to 4962
Formation tested: Miss. | Date, Time: 03-AUG-99; 00:18:46 |
|
Initial Hydro Pressure: 2440 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 38 PSI Initial Shut-in Pressure: 1097 PSI Second Initial Flow Pressure: 32 PSI Second Final Flow Pressure: 44 PSI Final Shut-in Pressure: 1314 PSI Final Hydro Pressure: 2431 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4923 ft. |
|
Initial Flow: Weak blow 1/2"" - 1"" Initial Shut-in: No blow Final Flow: Weak to fair blow slow increase to 5"" Final Shut-in: No blow |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 65 of Total Fluid 65 of Fluid in Drill Collars 235 of Gas in pipe. 65 of Gassy oil cut mud 10% gas 8% oil 82% mud 5000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4962 to 4975
Formation tested: Miss. | Date, Time: 03-AUG-99; 18:49:16 |
|
Initial Hydro Pressure: 2488 PSI
First Initial Flow Pressure: 330 PSI First Final Flow Pressure: 890 PSI Initial Shut-in Pressure: 1521 PSI Second Initial Flow Pressure: 1030 PSI Second Final Flow Pressure: 1423 PSI Final Shut-in Pressure: 1534 PSI Final Hydro Pressure: 2411 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4923 ft. |
| IF:Strong blow. Btm. of bucket in 1.5 mins. ISI:Strong blow. Btm. of bucket in 7 mins. FF:Strong blow. Btm. of bucket in 1.5 mins. FSI:Weak blow. (1/2 - 2"") | |
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: 25 Samples: none Gas Recovery: Comments: | |
|
Recovery 3030 of Total Fluid 30 of Fluid in Drill Collars 3000 of Fluid in Drill Pipe 250 of Gas in pipe. 120 of Gas & oil cut muddy water 180 of Gas & oil cut muddy water 2730 of Gassy salt water a few oil specs. 97000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4412 to 4440
Formation tested: Lans. F | Date, Time: 31-JUL-99; 18:29:25 |
|
Initial Hydro Pressure: 2208 PSI
First Initial Flow Pressure: 66 PSI First Final Flow Pressure: 414 PSI Initial Shut-in Pressure: 1438 PSI Second Initial Flow Pressure: 453 PSI Second Final Flow Pressure: 695 PSI Final Shut-in Pressure: 1432 PSI Final Hydro Pressure: 2105 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4395 ft. |
|
Initial Flow: Strong blow bottom of bucket in 4.5 mins. Initial Shut-in: Weak blow. (1/2"" - 1 1/2"") Final Flow: Strong blow bottom of bucket in 4.5 mins. Final Shut-in: Weak blow (1/2"") |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 24 Samples: none Gas Recovery: Comments: | |
|
Recovery 1380 of Total Fluid 30 of Fluid in Drill Collars 1350 of Fluid in Drill Pipe 180 of Muddy water 25% mud 75% water 1200 of Slight gas cut salt water. 3% gas 97% water 118000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |