Drill Stem Tests Database
Specific Well--15-097-21442
API: 15-097-21442
Operator: Ritchie Exploration, Inc.
Field: Joy Station South
Lease: Unruh, A.
Well 1
Location: T28S R19W, Sec. 29, NW SE
2060 North, 2000 West, from SE corner
Longitude: -99.4187386
Latitude: 37.5772301
County: Kiowa
Status: D&A
Spud Date: 26-JUL-99
Completion Date: 05-AUG-99
Plugging Date: 05-AUG-99
Total Depth: 5015
Form. at depth: MISSISSIPPIAN
Elevation: 2322 KB

Download DST Test Data

Test Number: 2 Data Source: TRILOBITE
Interval: 4940 to 4962
Formation tested: Miss.
Date, Time: 03-AUG-99; 00:18:46
Initial Hydro Pressure: 2440 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 38 PSI
Initial Shut-in Pressure: 1097 PSI
Second Initial Flow Pressure: 32 PSI
Second Final Flow Pressure: 44 PSI
Final Shut-in Pressure: 1314 PSI
Final Hydro Pressure: 2431 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4923 ft.
Initial Flow: Weak blow 1/2"" - 1"" Initial Shut-in: No blow
Final Flow: Weak to fair blow slow increase to 5""
Final Shut-in: No blow
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 12
Samples: none
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
65 of Fluid in Drill Collars
235 of Gas in pipe.
65 of Gassy oil cut mud 10% gas 8% oil 82% mud
5000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4962 to 4975
Formation tested: Miss.
Date, Time: 03-AUG-99; 18:49:16
Initial Hydro Pressure: 2488 PSI
First Initial Flow Pressure: 330 PSI
First Final Flow Pressure: 890 PSI
Initial Shut-in Pressure: 1521 PSI
Second Initial Flow Pressure: 1030 PSI
Second Final Flow Pressure: 1423 PSI
Final Shut-in Pressure: 1534 PSI
Final Hydro Pressure: 2411 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4923 ft.
IF:Strong blow. Btm. of bucket in 1.5 mins. ISI:Strong blow. Btm. of bucket in 7 mins. FF:Strong blow. Btm. of bucket in 1.5 mins. FSI:Weak blow. (1/2 - 2"")
Bottom Hole Temperature: 130 DEG F
Percent Porosity: 25
Samples: none
Gas Recovery:
Comments:
Recovery
3030 of Total Fluid
30 of Fluid in Drill Collars
3000 of Fluid in Drill Pipe
250 of Gas in pipe.
120 of Gas & oil cut muddy water
180 of Gas & oil cut muddy water
2730 of Gassy salt water a few oil specs.
97000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4412 to 4440
Formation tested: Lans. F
Date, Time: 31-JUL-99; 18:29:25
Initial Hydro Pressure: 2208 PSI
First Initial Flow Pressure: 66 PSI
First Final Flow Pressure: 414 PSI
Initial Shut-in Pressure: 1438 PSI
Second Initial Flow Pressure: 453 PSI
Second Final Flow Pressure: 695 PSI
Final Shut-in Pressure: 1432 PSI
Final Hydro Pressure: 2105 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4395 ft.
Initial Flow: Strong blow bottom of bucket in 4.5 mins. Initial Shut-in: Weak blow. (1/2"" - 1 1/2"")
Final Flow: Strong blow bottom of bucket in 4.5 mins.
Final Shut-in: Weak blow (1/2"")
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 24
Samples: none
Gas Recovery:
Comments:
Recovery
1380 of Total Fluid
30 of Fluid in Drill Collars
1350 of Fluid in Drill Pipe
180 of Muddy water 25% mud 75% water
1200 of Slight gas cut salt water. 3% gas 97% water
118000 of Salinity (PPM)
View Pressures No Recovery Gas data.