API: 15-101-21768
Operator: YOUNGER ENERGY CO Field: Buffalo Creek East Lease: JACK DUNNE Well 1-35 |
Location: T18S R28W, Sec. 35, N2 SW
1980 North, 1375 East, from SW corner Longitude: -100.38801 Latitude: 38.44314 County: Lane Status: OIL |
Spud Date: 05-JUL-99
Completion Date: 24-JUL-99 Plugging Date: Total Depth: 4541 Form. at depth: LANSING Elevation: 2699 KB |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4230 to 4280
Formation tested: KC 220'& Middle Crk | Date, Time: 15-JUL-99; 06:45:29 |
Initial Hydro Pressure: 2077 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 45 PSI Initial Shut-in Pressure: 945 PSI Second Initial Flow Pressure: 56 PSI Second Final Flow Pressure: 180 PSI Final Shut-in Pressure: 937 PSI Final Hydro Pressure: 2037 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3717 ft. |
Initial Flow: Weak to fair built to 9"" Initial Shut-in: Surface return steady throughout Final Flow: Fair to strong blow off bottom in 10 mins. Final Shut-in: Surface return built off bottom in 11 mins. |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 490 of Total Fluid 490 of Fluid in Drill Collars 570 of Gas in pipe 460 of Clean gassy oil 15%gas 85%oil 30 of Slight gassy oil cut mud 42 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 4283 to 4312
Formation tested: Pleasaton | Date, Time: 15-JUL-99; 22:54:27 |
Initial Hydro Pressure: 2087 PSI
First Initial Flow Pressure: 10 PSI First Final Flow Pressure: 13 PSI Initial Shut-in Pressure: 47 PSI Second Initial Flow Pressure: 16 PSI Second Final Flow Pressure: 18 PSI Final Shut-in Pressure: 56 PSI Final Hydro Pressure: 2007 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3780 ft. |
Initial Flow: Weak surface blow almost died Final Flow: No return blow |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 7 | Data Source: TRILOBITE |
Interval: 4386 to 4406
Formation tested: Pawnee | Date, Time: 16-JUL-99; 18:15:14 |
Initial Hydro Pressure: 2162 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 838 PSI Second Initial Flow Pressure: 15 PSI Second Final Flow Pressure: 16 PSI Final Shut-in Pressure: 154 PSI Final Hydro Pressure: 2115 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3873 ft. |
Initial Flow: Weak surface blow throughout Final Flow: No return blow |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1 of Total Fluid 1 of Fluid in Drill Collars 1 of Drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 8 | Data Source: TRILOBITE |
Interval: 4522 to 4541
Formation tested: Mississippian | Date, Time: 17-JUL-99; 22:03:19 |
Initial Hydro Pressure: 2268 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 35 PSI Initial Shut-in Pressure: 1257 PSI Second Initial Flow Pressure: 39 PSI Second Final Flow Pressure: 146 PSI Final Shut-in Pressure: 1208 PSI Final Hydro Pressure: 2155 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3997 ft. |
Initial Flow: Weak Surface blow built to 1"" Final Flow: Weak to fair blow slowly built to 9"" Final Shut-in: No return blow |
|
Bottom Hole Temperature: 134 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 315 of Total Fluid 315 of Fluid in Drill Collars 315 of Sulfer Water with trace of oil at top 20000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4010 to 4030
Formation tested: KC 70' | Date, Time: 12-JUL-99; 08:00:30 |
Initial Hydro Pressure: 1894 PSI
First Initial Flow Pressure: 147 PSI First Final Flow Pressure: 284 PSI Initial Shut-in Pressure: 1019 PSI Second Initial Flow Pressure: 327 PSI Second Final Flow Pressure: 614 PSI Final Shut-in Pressure: 946 PSI Final Hydro Pressure: 1865 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3503 ft. |
Initial Flow: Fair to strong blow 2 mins. Initial Shut-in: Surface return built to 11' Final Flow: Fair to strong blow off bottom in 1 min Final Shut-in: Surface return built to bottom in 13 mins. |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1690 of Total Fluid 520 of Fluid in Drill Collars 1170 of Fluid in Drill Pipe 1050 of Gas in pipe 1410 of Clean gassy oil 10%gas 90%oil 280 of Oil cut mud 5%oil 95%mud 39 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4100 to 4135
Formation tested: KC 140' | Date, Time: 13-JUL-99; 02:45:22 |
Initial Hydro Pressure: 1945 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 43 PSI Initial Shut-in Pressure: 1103 PSI Second Initial Flow Pressure: 55 PSI Second Final Flow Pressure: 123 PSI Final Shut-in Pressure: 1109 PSI Final Hydro Pressure: 1930 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: ft. |
Initial Flow: Weak blow built to 3"" Initial Shut-in: No return blow Final Flow: Weak to fair blow built to bottom in 22 mins. Final Shut-in: Weak surface return died in 10 mins |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 270 of Total Fluid 270 of Fluid in Drill Collars 140 of Clean gassy oil 10%gas 90%oil 130 of Oil cut mud 20%oil 80%mud 39 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4165 to 4196
Formation tested: KC 180' | Date, Time: 13-JUL-99; 20:55:52 |
Initial Hydro Pressure: 2001 PSI
First Initial Flow Pressure: 12 PSI First Final Flow Pressure: 13 PSI Initial Shut-in Pressure: 804 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 34 PSI Final Shut-in Pressure: 793 PSI Final Hydro Pressure: 1958 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3655 ft. |
Initial Flow: Weak surface blow built to 1"" Initial Shut-in: No return blow Final Flow: Weak surface return built to 6"" Final Shut-in: No return blow |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 20 of Free Oil 10 of Oil cut mud 20%oil 80%mud 39 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4195 to 4230
Formation tested: KC 200' | Date, Time: 14-JUL-99; 11:26:04 |
Initial Hydro Pressure: 2008 PSI
First Initial Flow Pressure: 12 PSI First Final Flow Pressure: 27 PSI Initial Shut-in Pressure: 770 PSI Second Initial Flow Pressure: 35 PSI Second Final Flow Pressure: 91 PSI Final Shut-in Pressure: 775 PSI Final Hydro Pressure: 1958 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 520 ft. Drill Pipe Length: 3686 ft. |
Initial Flow: Weak surface blow built to 1"" Initial Shut-in: No return blow Final Flow: Weak surface blow slowly built to 5"" Final Shut-in: No return blow |
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 140 of Total Fluid 140 of Fluid in Drill Collars 10 of Free Oil 10 of Oil cut mud 10%gas 40%oil 50%mud 60 of Slight gas oil cut mud 5%gas 15%oil 80%mud 60 of Slight oily mud cut water 5%oil 55%wtr 40%mud 44 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |