Drill Stem Tests Database
Specific Well--15-119-20052-0001
API: 15-119-20052-0001
Operator: MIDCO EXPLORATION, INC.
Field: Wildcat
Lease: Theis
Well 1-24
Location: T33S R26W, Sec. 24, NW
1475 South, 1475 East, from NW corner
Longitude: -100.1031697
Latitude: 37.1642514
County: Meade
Status: D&A
Spud Date: 25-MAY-99
Completion Date: 07-SEP-99
Plugging Date: 07-SEP-99
Total Depth: 6150
Form. at depth: ST LOUIS
Elevation: 2148 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3426 to 3456
Formation tested: Wabunsee
Date, Time: 27-MAY-99; 01:51:03
Initial Hydro Pressure: 1715 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 131 PSI
Initial Shut-in Pressure: 1171 PSI
Second Initial Flow Pressure: 129 PSI
Second Final Flow Pressure: 214 PSI
Final Shut-in Pressure: 1156 PSI
Final Hydro Pressure: 1666 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.5 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 2767 ft.
Initial Flow: Fair blow built to 8""
Final Flow: No blow for 2 mins. blow building 6""
Bottom Hole Temperature: 104 DEG F
Percent Porosity: 20
Samples:
Gas Recovery:
Comments:
Recovery
425 of Total Fluid
425 of Fluid in Drill Collars
125 of Muddy water 70%water 30%Mud
300 of Muddy water 90%Water 10%Mud
50000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4533 to 4583
Formation tested: Lansing ""C""
Date, Time: 29-MAY-99; 19:37:52
Initial Hydro Pressure: 2243 PSI
First Initial Flow Pressure: 312 PSI
First Final Flow Pressure: 451 PSI
Initial Shut-in Pressure: 1616 PSI
Second Initial Flow Pressure: 497 PSI
Second Final Flow Pressure: 557 PSI
Final Shut-in Pressure: 1615 PSI
Final Hydro Pressure: 2151 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 3907 ft.
Initial Flow: Strong blow bottom of bucket in 2 mins. Initial Shut-in: No blow black
Final Flow: Fair blow bottom of bucket in 6 mins.
Final Shut-in: No blow back
Bottom Hole Temperature: 115 DEG F
Percent Porosity: 15
Samples: NO
Gas Recovery:
Comments:
Recovery
1100 of Total Fluid
638 of Fluid in Drill Collars
462 of Fluid in Drill Pipe
182 of Watery mud 40%Water 60%Mud
918 of Salt Water 100%
63000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5480 to 5500
Formation tested: Chester A-2
Date, Time: 02-JUN-99; 01:41:57
Initial Hydro Pressure: 2824 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 1497 PSI
Second Initial Flow Pressure: 10 PSI
Second Final Flow Pressure: 12 PSI
Final Shut-in Pressure: 1717 PSI
Final Hydro Pressure: 2666 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 4833 ft.
Initial Flow: Strong blow bottom of bucket in 5 mins. Initial Shut-in: No blow back
Final Flow: Strong blow bottom of bucket as soon as tool opened
Final Shut-in: No blow back
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 10
Samples: NO
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
1060 of gas in pipe
20 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5500 to 5525
Formation tested: Chester B-1
Date, Time: 03-JUN-99; 20:12:54
Initial Hydro Pressure: 2764 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 80 PSI
Initial Shut-in Pressure: 1650 PSI
Second Initial Flow Pressure: 88 PSI
Second Final Flow Pressure: 125 PSI
Final Shut-in Pressure: 1598 PSI
Final Hydro Pressure: 2629 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 4864 ft.
Initial Flow: Strong blow bottom of bucket in 3 mins. Initial Shut-in: No blow back
Final Flow: Slow building blow built to 4.5""
Final Shut-in: No blow back
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 12
Samples: NO
Gas Recovery:
Comments:
Recovery
210 of Total Fluid
210 of Fluid in Drill Collars
570 of Gas in pipe
30 of Muddy water 50% mud 50% water
90 of Muddy water 15% mud 85% water
60 of Water
57000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 5531 to 5550
Formation tested: Chester ""B""-2
Date, Time: 04-JUN-99; 14:39:26
Initial Hydro Pressure: 2796 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 1952 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 14 PSI
Final Shut-in Pressure: 1878 PSI
Final Hydro Pressure: 2724 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 4894 ft.
Initial Flow: Strong blow bottom of bucket in 1 min. Gas to surface in 25 mins. MCF @ 52.4
Final Flow: Strong blow bottom of bucket as soon as open tool MCF @ 94.1
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 10
Samples: yes 1
Gas Recovery:
Comments:
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 7 Data Source: TRILOBITE
Interval: 5738 to 5792
Formation tested: Chester ""C""
Date, Time: 07-JUN-99; 10:38:41
Initial Hydro Pressure: 3010 PSI
First Initial Flow Pressure: 210 PSI
First Final Flow Pressure: 278 PSI
Initial Shut-in Pressure: 629 PSI
Second Initial Flow Pressure: 310 PSI
Second Final Flow Pressure: 310 PSI
Final Shut-in Pressure: 406 PSI
Final Hydro Pressure: 3010 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 5443 ft.
Initial Flow: Slow building blow built to 6""
Final Flow: No blow
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 12
Samples:
Gas Recovery:
Comments:
Recovery
310 of Total Fluid
310 of Fluid in Drill Collars
310 of Drilling mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5446 to 5477
Formation tested: Chester
Date, Time: 02-JUN-99; 05:07:56
Initial Hydro Pressure: 2779 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 806 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 1880 PSI
Final Hydro Pressure: 2709 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 638 ft.
Drill Pipe Length: 4802 ft.
Initial Flow: Slow blow building to bottom of bucket in 11 mins. Initial Shut-in: No blow back
Final Flow: Lost packer seat open again strong blow bottom of bucket in 5 mins.
Final Shut-in: No blow back
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
65 of Fluid in Drill Collars
65 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.