Drill Stem Tests Database
Specific Well--15-155-21436
API: 15-155-21436
Operator: MTM Petroleum, Inc.
Field: Elward
Lease: Krehbiel
Well 11-25
Location: T25S R6W, Sec. 11, NW SW SE
1260 North, 2193 West, from SE corner
Longitude: -97.9477141
Latitude: 37.8865312
County: Reno
Status: D&A
Spud Date: 16-JUL-99
Completion Date: 22-JUL-99
Plugging Date: 22-JUL-99
Total Depth: 3545
Form. at depth: MISSISSIPPIAN
Elevation: 1500 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3531 to 3545
Formation tested: Miss.
Date, Time: 20-JUL-99; 21:02:32
Initial Hydro Pressure: 1710 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 103 PSI
Initial Shut-in Pressure: 834 PSI
Second Initial Flow Pressure: 110 PSI
Second Final Flow Pressure: 137 PSI
Final Shut-in Pressure: 823 PSI
Final Hydro Pressure: 1704 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3279 ft.
Initial Flow: Fair to strong blow bottom of bucket in 25 mins. Initial Shut-in: No blow.
Final Flow: Weak blow 1/2 - 3 1/2""
Final Shut-in: No blow
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 16
Samples: none
Gas Recovery:
Comments:
Recovery
275 of Total Fluid
240 of Fluid in Drill Collars
35 of Fluid in Drill Pipe
30 of Heavy mud.
65 of Muddy water 20% mud 80% water
180 of Salt water
110000 of Salinity (PPM)
View Pressures No Recovery Gas data.