API: 15-155-21439
Operator: R & B Oil & Gas, Inc. Field: Lerado Southwest Lease: Cole Well 2 |
Location: T26S R9W, Sec. 13, SE SW SW
330 North, 4290 West, from SE corner Longitude: -98.2604598 Latitude: 37.7770865 County: Reno Status: O&G-P&A |
Spud Date: 28-SEP-99
Completion Date: 02-OCT-99 Plugging Date: 02-OCT-99 Total Depth: 2424 Form. at depth: TOPEKA Elevation: 1649 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 2177 to 2227
Formation tested: Indian Cave | Date, Time: 01-OCT-99; 14:48:53 |
Initial Hydro Pressure: 981 PSI
First Initial Flow Pressure: 31 PSI First Final Flow Pressure: 77 PSI Initial Shut-in Pressure: 622 PSI Second Initial Flow Pressure: 74 PSI Second Final Flow Pressure: 103 PSI Final Shut-in Pressure: 610 PSI Final Hydro Pressure: 972 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 2174 ft. |
Initial Flow: Fair to strong blow bottom of bucket in 8 mins. Initial Shut-in: No blow. Final Flow: Strong blow bottom of bucket in 3.5 mins. Final Shut-in: No blow |
|
Bottom Hole Temperature: 87 DEG F
Percent Porosity: 14 Samples: none Gas Recovery: Comments: | |
Recovery 180 of Total Fluid 180 of Fluid in Drill Pipe 120 of Gas in Pipe. Faint oder. 180 of Drilling mud 14% water 86% mud 2000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 2378 to 2424
Formation tested: Tarkio | Date, Time: 02-OCT-99; 10:28:14 |
Initial Hydro Pressure: 1116 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 49 PSI Initial Shut-in Pressure: 758 PSI Second Initial Flow Pressure: 59 PSI Second Final Flow Pressure: 85 PSI Final Shut-in Pressure: 703 PSI Final Hydro Pressure: 1074 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 2361 ft. |
Initial Flwo: Strong blow gas to surface in 15 mins (see gas volume report) Initial Shut-in: Weak blow. (1/2"") Final Flow: Strong blow (see gas volume report) Final Shut-in: No blow |
|
Bottom Hole Temperature: 90 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
Recovery 140 of Total Fluid 140 of Fluid in Drill Pipe 80 of Gas cut mud 10% gas 90% mud 60 of Muddy water 35% mud 65% water 58000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |