API: 15-159-22368
Operator: EAGLE CREEK CORP. Field: Click Southeast Lease: Rolfs Well 3-4 |
Location: T18S R7W, Sec. 4, W2 W2 NE
1320 South, 2310 West, from NE corner Longitude: -98.0982329 Latitude: 38.5186043 County: Rice Status: OIL |
Spud Date: 07/21/1999
Completion Date: 08/12/1999 Plugging Date: Total Depth: 3270 Form. at depth: MAQUOKETA Elevation: 1705 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3131 to 3171
Formation tested: Cong Sd | Date, Time: 07/27/1999; 14:19:01 |
Initial Hydro Pressure: 1602 PSI
First Initial Flow Pressure: 260 PSI First Final Flow Pressure: 499 PSI Initial Shut-in Pressure: 860 PSI Second Initial Flow Pressure: 515 PSI Second Final Flow Pressure: 570 PSI Final Shut-in Pressure: 868 PSI Final Hydro Pressure: 1541 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 210 ft. Drill Pipe Length: 2906 ft. |
Initial Flow: Strong-bottom of bucket in 30 sec Gas to surface in 3 min-gauged Initial Shut-in: Bled off blow-blow bame and built to bottom of bucket Final Flow: Strong bottom of bucket as soon as tool opened-fuild to surface in 5 mins. |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1140 of Total Fluid 210 of Fluid in Drill Collars 930 of Fluid in Drill Pipe 623 of Clean gassy oil 20% gas 80% oil 507 of Frothy mud cut oil 40% gas 50% oil 10% mud 10 of Water 35000 of Salinity (PPM) 36 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |