Drill Stem Tests Database
Specific Well--15-187-20921
API: 15-187-20921
Operator:
Field: Sparks
Lease: Heyen
Well 29-21
Location: T30S R42W, Sec. 29, W2 NE NW
650 South, 1640 East, from NW corner
Longitude: -101.9381262
Latitude: 37.416401
County: Stanton
Status: GAS-P&A
Spud Date: 07-MAY-99
Completion Date: 21-AUG-99
Plugging Date: 08-APR-11
Total Depth: 5647
Form. at depth: ST LOUIS
Elevation: 3575 KB
Test Number: 5 Data Source: TRILOBITE
Interval: 5200 to 5325
Formation tested: Keys
Date, Time: 21-MAY-99; 16:15:11
Initial Hydro Pressure: 508 PSI
First Initial Flow Pressure: 140 PSI
First Final Flow Pressure: 307 PSI
Initial Shut-in Pressure: 662 PSI
Second Initial Flow Pressure: 276 PSI
Second Final Flow Pressure: 609 PSI
Final Shut-in Pressure: 741 PSI
Final Hydro Pressure: 530 PSI
Tool Data
Hole Size: 6.25 in.
Drill Collar ID: 2.125 in.
Drill Pipe ID: 2.75 in.
Drill Collar Length: 366 ft.
Drill Pipe Length: 4835 ft.
Strong OBB immed. GTS in 5 min. Guaged 37,400 CFPD. I.F.P. Strong OBB blow-back. I.S.I.P. Strong OBB immed. Guaged 72,400 CFPD. F.F.P. Strong OBB blow-back. F.S.I.P. Remarks: Est. 80 ft. of pay. Gas burned. Pulled tool loose at 3:20 A.M. Wait on daylight 120 ft. off bot- tem.
Bottom Hole Temperature: 136 DEG F
Percent Porosity: 12
Samples: One
Gas Recovery:
Comments:
Recovery
1250 of Total Fluid
366 of Fluid in Drill Collars
884 of Fluid in Drill Pipe
3951 of Gas in pipe
1250 of Gassy Water 12% Gas 88% Water
16200 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3684 to 3711
Formation tested: Lansing
Date, Time: 12-MAY-99; 01:30:26
Initial Hydro Pressure: 1767 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 603 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 51 PSI
Final Shut-in Pressure: 659 PSI
Final Hydro Pressure: 1762 PSI
Tool Data
Hole Size: 8.75 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3673 ft.
Initial Flow: Strong off bottom of bucket immediatley and throughout Initial Shut-in: No blow back
Final Flow: Strong off bottom of bucket immediatley and throughout
Final Shut-in"" No blow back
Bottom Hole Temperature: 103 DEG F
Percent Porosity: 26
Samples: None
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Pipe
1790 of Gas in pipr ""Sour Odor"" Possible H2S
70 of Water cut Mud 42% Water 58% Mud
9500 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4182 to 4223
Formation tested: Marmaton
Date, Time: 13-MAY-99; 13:57:25
Initial Hydro Pressure: 2016 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 884 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 84 PSI
Final Shut-in Pressure: 931 PSI
Final Hydro Pressure: 2006 PSI
Tool Data
Hole Size: 8.75 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4169 ft.
Initial Flow: Strong off bottom of bucket in 30 secs. strong throughout Initial Shut-in: No blow back
Final Flow: Strong off bottom of bucket in 2 mins. strong throughout
Final Shut-in: Surface blow back Remarks: Est. 30 ft. of pay.
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 18
Samples: None
Gas Recovery:
Comments:
Recovery
135 of Total Fluid
135 of Fluid in Drill Pipe
885 of Gas in pipe
30 of Gas cut Mud 13% Gas 87% Mud
105 of Mud cut Water 38% Mud 62% Water
20000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5155 to 5210
Formation tested: Morrow
Date, Time: 17-MAY-99; 05:42:09
Initial Hydro Pressure: 2543 PSI
First Initial Flow Pressure: 38 PSI
First Final Flow Pressure: 50 PSI
Initial Shut-in Pressure: 824 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 50 PSI
Final Shut-in Pressure: 822 PSI
Final Hydro Pressure: 2475 PSI
Tool Data
Hole Size: 8.75 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 183 ft.
Drill Pipe Length: 4972 ft.
Weak 1/2"", built to strong OBB in 5 min. I.F.P. No blow-back. I.S.I.P. Strong immed. Cracked 2"" slightly. GTS in 22 min. Guaged 17,200 CFPD. F.F.P. Surface blow-back. F.S.I.P. Remarks: 14 ft. of pay.
Final 5 min. of F.F.P. press-
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 13
Samples: One
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
5065 of Gas in pipe
90 of Mud
840 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 3685 to 3711
Formation tested: Lansing
Date, Time: 11-MAY-99; 20:46:19
Initial Hydro Pressure: 1764 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1764 PSI
Tool Data
Hole Size: 8.75 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3673 ft.
Missrun ""Packer Failure""
Bottom Hole Temperature: 100 DEG F
Percent Porosity: 26
Samples: None
Gas Recovery:
Comments:
Recovery
360 of Total Fluid
360 of Fluid in Drill Pipe
360 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.