Drill Stem Tests Database
Specific Well--15-093-21651
API: 15-093-21651
Operator: Lebsack Oil Production Inc.
Field: Christabelle
Lease: CBH
Well 1-13
Location: T21S R35W, Sec. 13, NW NW SW
2310 North, 330 East, from SW corner
Longitude: -101.1201617
Latitude: 38.2271004
County: Kearny
Status: D&A
Spud Date: 10/01/1999
Completion Date: 10/08/1999
Plugging Date: 10/08/1999
Total Depth: 5000
Form. at depth: MISSISSIPPIAN
Elevation: 3110 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4807 to 4870
Formation tested: morrow
Date, Time: 10/07/1999; 12:44:35
Initial Hydro Pressure: 2487 PSI
First Initial Flow Pressure: 37 PSI
First Final Flow Pressure: 49 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: 58 PSI
Final Hydro Pressure: 2390 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 231 ft.
Drill Pipe Length: 4596 ft.
Initial Flow: 1/4"" blow died back to work surface blow
Final Shut-in: No return
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Mud 100% mud
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4879 to 4900
Formation tested: morrow
Date, Time: 10/07/1999; 22:09:42
Initial Hydro Pressure: 2587 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 26 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: 49 PSI
Final Hydro Pressure: 2503 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 231 ft.
Drill Pipe Length: 4626 ft.
Initial Flow: Weak surface blow died in 6 mins.
Final Shut-in: No return
Bottom Hole Temperature: 108 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2 of Total Fluid
2 of Fluid in Drill Collars
2 of Drilling mud
View Pressures No Recovery Gas data.