API: 15-033-21028
Operator: DAYSTAR PETROLEUM INC. Field: Colter Lease: Lousch 'C' Well 1 |
Location: T33S R18W, Sec. 6, NW NE SW NE
1514 South, 3573 East, from NW corner Longitude: -99.315056 Latitude: 37.2037439 County: Comanche Status: GAS-P&A |
Spud Date: 30-AUG-99
Completion Date: 28-SEP-99 Plugging Date: 03-APR-19 Total Depth: 6225 Form. at depth: ARBUCKLE Elevation: 2090 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4835 to 4868
Formation tested: Lansing(Swope) | Date, Time: 06-SEP-99; 17:22:14 |
Initial Hydro Pressure: 2350 PSI
First Initial Flow Pressure: 95 PSI First Final Flow Pressure: 104 PSI Initial Shut-in Pressure: 613 PSI Second Initial Flow Pressure: 97 PSI Second Final Flow Pressure: 115 PSI Final Shut-in Pressure: 605 PSI Final Hydro Pressure: 2325 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4832 ft. |
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 4 mins. Initial Shut-in: Bled down for 30 mins no blow back. Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas Final Shut-in: Bled down for 10 mins. no blow back |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 100 of Total Fluid 100 of Fluid in Drill Pipe 4732 of Gas in pipe 100 of Very slight gas cut mud 4% gas 96% mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5222 to 5275
Formation tested: Miss (upper) | Date, Time: 07-SEP-99; 10:25:51 |
Initial Hydro Pressure: 2595 PSI
First Initial Flow Pressure: 45 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 1013 PSI Second Initial Flow Pressure: 21 PSI Second Final Flow Pressure: 22 PSI Final Shut-in Pressure: 819 PSI Final Hydro Pressure: 2553 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 6 mins. Initial Shut-in: Bled down for 5 mnis Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas Final Shut-in: Bled down for 2 mins. no blow back |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Caraway analytical,728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 5200 of Gas in pipe 40 of Very slight gas cut mud 8% gas 92% mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |