Drill Stem Tests Database
Specific Well--15-033-21028
API: 15-033-21028
Operator: DAYSTAR PETROLEUM INC.
Field: Colter
Lease: Lousch 'C'
Well 1
Location: T33S R18W, Sec. 6, NW NE SW NE
1514 South, 3573 East, from NW corner
Longitude: -99.315056
Latitude: 37.2037439
County: Comanche
Status: GAS-P&A
Spud Date: 30-AUG-99
Completion Date: 28-SEP-99
Plugging Date: 03-APR-19
Total Depth: 6225
Form. at depth: ARBUCKLE
Elevation: 2090 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4835 to 4868
Formation tested: Lansing(Swope)
Date, Time: 06-SEP-99; 17:22:14
Initial Hydro Pressure: 2350 PSI
First Initial Flow Pressure: 95 PSI
First Final Flow Pressure: 104 PSI
Initial Shut-in Pressure: 613 PSI
Second Initial Flow Pressure: 97 PSI
Second Final Flow Pressure: 115 PSI
Final Shut-in Pressure: 605 PSI
Final Hydro Pressure: 2325 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4832 ft.
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 4 mins. Initial Shut-in: Bled down for 30 mins no blow back.
Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas
Final Shut-in: Bled down for 10 mins. no blow back
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
100 of Total Fluid
100 of Fluid in Drill Pipe
4732 of Gas in pipe
100 of Very slight gas cut mud 4% gas 96% mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5222 to 5275
Formation tested: Miss (upper)
Date, Time: 07-SEP-99; 10:25:51
Initial Hydro Pressure: 2595 PSI
First Initial Flow Pressure: 45 PSI
First Final Flow Pressure: 28 PSI
Initial Shut-in Pressure: 1013 PSI
Second Initial Flow Pressure: 21 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 819 PSI
Final Hydro Pressure: 2553 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 6 mins. Initial Shut-in: Bled down for 5 mnis
Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas
Final Shut-in: Bled down for 2 mins. no blow back
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples: Caraway analytical,728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
40 of Total Fluid
40 of Fluid in Drill Pipe
5200 of Gas in pipe
40 of Very slight gas cut mud 8% gas 92% mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.