Drill Stem Tests Database
Specific Well--15-033-21027
API: 15-033-21027
Operator: R.J. Patrick Operating Co.
Field: Wildcat
Lease: Inez Bean
Well 1-4
Location: T32S R19W, Sec. 4, SE SW NE
2310 South, 1650 West, from NE corner
Longitude: -99.3880194
Latitude: 37.2882979
County: Comanche
Status: GAS
Spud Date: 10-SEP-99
Completion Date: 05-OCT-99
Plugging Date:
Total Depth: 5370
Form. at depth: MISSISSIPPIAN
Elevation: 2123 KB
all Log-Tech elogs, Drill Time & Sample, Cement Bond Log originally mismarked 2130 KB. Dual Comp, Dual Induction, Microresistivity originally mismarked Twnshp 23 S. --cb 2/4/02
Test Number: 1 Data Source: TRILOBITE
Interval: 5114 to 5134
Formation tested: Pawnee
Date, Time: 21-SEP-99; 18:33:49
Initial Hydro Pressure: 2519 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 27 PSI
Initial Shut-in Pressure: 1351 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 1179 PSI
Final Hydro Pressure: 2486 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5096 ft.
Initial Flow: Weak blow built to 4"" in water bucket Initial Shut-in: Bled off for 1 min. no blow back.
Final Flow Weak blow built to 1"" in water bucket
Final Shut-in: Bled off 5 mins. no blow back
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
40 of Total Fluid
40 of Fluid in Drill Pipe
40 of Mud cut water 40%mud 60%water
10000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5143 to 5160
Formation tested: Fort scott
Date, Time: 22-SEP-99; 12:41:45
Initial Hydro Pressure: 2499 PSI
First Initial Flow Pressure: 13 PSI
First Final Flow Pressure: 8 PSI
Initial Shut-in Pressure: 24 PSI
Second Initial Flow Pressure: 6 PSI
Second Final Flow Pressure: 7 PSI
Final Shut-in Pressure: 20 PSI
Final Hydro Pressure: 2500 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5127 ft.
Initial Flow: Weak blow built to 4"" in water bucket Initial Shut-in: Bled down for 1 min. no blow back.
Final Flow: Weak surface blow built to 1/4-1/2"" in water bucket
Final Shut-in: Bled down for 5 mins. no blow back
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Pipe
15 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.