Drill Stem Tests Database
Specific Well--15-119-21003
API: 15-119-21003
Operator: Raydon Exploration, Inc.
Field: Adams Ranch West
Lease: Wynona
Well 1-7
Location: T35S R29W, Sec. 7, W2
1265 South, 649 East, from NW corner
Longitude: -100.5214967
Latitude: 37.0214233
County: Meade
Status: OIL-P&A
Spud Date: 28-AUG-99
Completion Date: 11-OCT-99
Plugging Date: 15-JUN-16
Total Depth: 6440
Form. at depth: CHESTER
Elevation: 2457 KB
Test Number: 4 Data Source: TRILOBITE
Interval: 6320 to 6350
Formation tested: St. Louis
Date, Time: 14-SEP-99; 10:21:50
Initial Hydro Pressure: 3238 PSI
First Initial Flow Pressure: 74 PSI
First Final Flow Pressure: 187 PSI
Initial Shut-in Pressure: 2015 PSI
Second Initial Flow Pressure: 185 PSI
Second Final Flow Pressure: 378 PSI
Final Shut-in Pressure: 2020 PSI
Final Hydro Pressure: 3116 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.5 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 633 ft.
Drill Pipe Length: 5673 ft.
1st opening Very strong blow B.O.B in 1 min. GTS in 20 min MCF @ 34300 ISI Bled off blow B.O.B in 25 min 2nd opening strong blow B.O.B in 1 min MCF @ 39600 FSI Bled offblow B.O.B in 9 min.
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 14
Samples: Yes 1
Gas Recovery:
Comments:
Recovery
965 of Total Fluid
633 of Fluid in Drill Collars
332 of Fluid in Drill Pipe
482 of Clean gassy oil 30%Gas 70%Oil
120 of Gassy slight oil cut mud 30%Gas 20%Oil 50%Mud
120 of Gassy slight oil and water cut mud
243 of Muddy water 90% water 10% mud
130000 of Salinity (PPM)
32.3 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 5760 to 5810
Formation tested: Morrow
Date, Time: 07-SEP-99; 18:49:45
Initial Hydro Pressure: 2941 PSI
First Initial Flow Pressure: 39 PSI
First Final Flow Pressure: 53 PSI
Initial Shut-in Pressure: 194 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 49 PSI
Final Shut-in Pressure: 263 PSI
Final Hydro Pressure: 2719 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 225 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 633 ft.
Drill Pipe Length: 5120 ft.
Initial Flow: Weak building to 8"" fair blow Initial Shut-in: Bled off blow-no blow back
Final Flow: Weak surface blow-flushed tool-good surge-blow built to 3""
Final Shut-in: Bled off blow-no blow back
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of Drilling mud
200 of Gas in pipe
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5833 to 5890
Formation tested: Morrow Sd
Date, Time: 09-SEP-99; 06:40:39
Initial Hydro Pressure: 2887 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 167 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 36 PSI
Final Shut-in Pressure: 171 PSI
Final Hydro Pressure: 2762 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 633 ft.
Drill Pipe Length: 5178 ft.
Initial Flow: Weak-building to 9"" fair blow Initial Shut-in: Bled off blow-no blow back
Final Flow: Weak-building to 4""
Final Shut-in: Bled off blow-no blow back
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
50 of Total Fluid
50 of Fluid in Drill Collars
300 of Gas in pipe
50 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 6114 to 6150
Formation tested: Chester
Date, Time: 12-SEP-99; 13:24:42
Initial Hydro Pressure: 3052 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 392 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 31 PSI
Final Shut-in Pressure: 409 PSI
Final Hydro Pressure: 2952 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.5 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 633 ft.
Drill Pipe Length: 5487 ft.
Initial Flow: Weak surface blow
Final Flow: Slow building blow bottom of bucket in 21 mins.
Bottom Hole Temperature: 131 DEG F
Percent Porosity: 10
Samples: NO
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
765 of Gas in pipe
15 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.