API: 15-119-21003
Operator: Raydon Exploration, Inc. Field: Adams Ranch West Lease: Wynona Well 1-7 |
Location: T35S R29W, Sec. 7, W2
1265 South, 649 East, from NW corner Longitude: -100.5214967 Latitude: 37.0214233 County: Meade Status: OIL-P&A |
Spud Date: 28-AUG-99
Completion Date: 11-OCT-99 Plugging Date: 15-JUN-16 Total Depth: 6440 Form. at depth: CHESTER Elevation: 2457 KB |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 6320 to 6350
Formation tested: St. Louis | Date, Time: 14-SEP-99; 10:21:50 |
Initial Hydro Pressure: 3238 PSI
First Initial Flow Pressure: 74 PSI First Final Flow Pressure: 187 PSI Initial Shut-in Pressure: 2015 PSI Second Initial Flow Pressure: 185 PSI Second Final Flow Pressure: 378 PSI Final Shut-in Pressure: 2020 PSI Final Hydro Pressure: 3116 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.5 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 633 ft. Drill Pipe Length: 5673 ft. |
1st opening Very strong blow B.O.B in 1 min. GTS in 20 min MCF @ 34300 ISI Bled off blow B.O.B in 25 min 2nd opening strong blow B.O.B in 1 min MCF @ 39600 FSI Bled offblow B.O.B in 9 min. | |
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 14 Samples: Yes 1 Gas Recovery: Comments: | |
Recovery 965 of Total Fluid 633 of Fluid in Drill Collars 332 of Fluid in Drill Pipe 482 of Clean gassy oil 30%Gas 70%Oil 120 of Gassy slight oil cut mud 30%Gas 20%Oil 50%Mud 120 of Gassy slight oil and water cut mud 243 of Muddy water 90% water 10% mud 130000 of Salinity (PPM) 32.3 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5760 to 5810
Formation tested: Morrow | Date, Time: 07-SEP-99; 18:49:45 |
Initial Hydro Pressure: 2941 PSI
First Initial Flow Pressure: 39 PSI First Final Flow Pressure: 53 PSI Initial Shut-in Pressure: 194 PSI Second Initial Flow Pressure: 31 PSI Second Final Flow Pressure: 49 PSI Final Shut-in Pressure: 263 PSI Final Hydro Pressure: 2719 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 225 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 633 ft. Drill Pipe Length: 5120 ft. |
Initial Flow: Weak building to 8"" fair blow Initial Shut-in: Bled off blow-no blow back Final Flow: Weak surface blow-flushed tool-good surge-blow built to 3"" Final Shut-in: Bled off blow-no blow back |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling mud 200 of Gas in pipe | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5833 to 5890
Formation tested: Morrow Sd | Date, Time: 09-SEP-99; 06:40:39 |
Initial Hydro Pressure: 2887 PSI
First Initial Flow Pressure: 29 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 167 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 36 PSI Final Shut-in Pressure: 171 PSI Final Hydro Pressure: 2762 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 633 ft. Drill Pipe Length: 5178 ft. |
Initial Flow: Weak-building to 9"" fair blow Initial Shut-in: Bled off blow-no blow back Final Flow: Weak-building to 4"" Final Shut-in: Bled off blow-no blow back |
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 50 of Total Fluid 50 of Fluid in Drill Collars 300 of Gas in pipe 50 of Drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 6114 to 6150
Formation tested: Chester | Date, Time: 12-SEP-99; 13:24:42 |
Initial Hydro Pressure: 3052 PSI
First Initial Flow Pressure: 29 PSI First Final Flow Pressure: 30 PSI Initial Shut-in Pressure: 392 PSI Second Initial Flow Pressure: 27 PSI Second Final Flow Pressure: 31 PSI Final Shut-in Pressure: 409 PSI Final Hydro Pressure: 2952 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.5 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 633 ft. Drill Pipe Length: 5487 ft. |
Initial Flow: Weak surface blow Final Flow: Slow building blow bottom of bucket in 21 mins. |
|
Bottom Hole Temperature: 131 DEG F
Percent Porosity: 10 Samples: NO Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 765 of Gas in pipe 15 of Drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |