Drill Stem Tests Database
Specific Well--15-203-20133
API: 15-203-20133
Operator: ABERCROMBIE ENERGY, LLC
Field: Unknown
Lease: Glee Smith
Well 1-19
Location: T20S R35W, Sec. 19, S2 SW SE
460 North, 1980 West, from SE corner
Longitude: -101.2243602
Latitude: 38.2944644
County: Wichita
Status: D&A
Spud Date: 03-NOV-99
Completion Date: 11-NOV-99
Plugging Date: 11-NOV-99
Total Depth: 5050
Form. at depth: MISSISSIPPIAN
Elevation: 3214 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2704 to 2775
Formation tested: Chase
Date, Time: 05-NOV-99; 12:27:22
Initial Hydro Pressure: 1330 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 20 PSI
Initial Shut-in Pressure: 54 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 28 PSI
Final Shut-in Pressure: 46 PSI
Final Hydro Pressure: 1310 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 234 ft.
Drill Pipe Length: 2478 ft.
Initial Flow: Weak surface blow died in 10 mins.
Final Flow: No return - flushed tool - Surface blow died in 5 mins.
Bottom Hole Temperature: 82 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Drilling mud
View Pressures No Recovery Gas data.