API: 15-175-21779
Operator: STELBAR OIL CORP. Field: Shamrock Northeast Lease: Conard Well 1-20 |
Location: T31S R32W, Sec. 20, NW SW SE NE
3157 North, 1008 West, from SE corner Longitude: -100.8190792 Latitude: 37.3383765 County: Seward Status: OIL-P&A |
Spud Date: 27-OCT-99
Completion Date: 30-NOV-99 Plugging Date: 25-FEB-22 Total Depth: 5820 Form. at depth: MARMATON Elevation: 2874 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4263 to 4297
Formation tested: lansing | Date, Time: 01-NOV-99; 00:40:21 |
Initial Hydro Pressure: 1998 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 1017 PSI Second Initial Flow Pressure: 32 PSI Second Final Flow Pressure: 43 PSI Final Shut-in Pressure: 959 PSI Final Hydro Pressure: 1941 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 629 ft. Drill Pipe Length: 3638 ft. |
Initial Flow: Weak 1/4"" surface blow died out Final Flow: No blow back Final Flow: No blow |
|
Bottom Hole Temperature: 105 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of mud 100% | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4873 to 4913
Formation tested: Marmaton | Date, Time: 03-NOV-99; 16:04:19 |
Initial Hydro Pressure: 2278 PSI
First Initial Flow Pressure: 60 PSI First Final Flow Pressure: 131 PSI Initial Shut-in Pressure: 1443 PSI Second Initial Flow Pressure: 123 PSI Second Final Flow Pressure: 219 PSI Final Shut-in Pressure: 1424 PSI Final Hydro Pressure: 2222 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 629 ft. Drill Pipe Length: 4225 ft. |
Initial Flow: Bottom of bucket strong in 1 min. 30 secs. gas to surface in 15 mins. gas will burn Initial Shut-in: Bled 2 1/4"" blow back Final Flow: Bottom of bucket in 2 mins. Final Shut-in: Bled 2 1/2"" blow back |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1100 of Total Fluid 629 of Fluid in Drill Collars 471 of Fluid in Drill Pipe 720 of Gassy oil 30% Gas 70% Oil 380 of Gassy oil cut mud 40% Gas 20% Oil 40% Mud 46 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |