|
API: 15-055-21658
Operator: PetroSantander (USA) Inc. Field: Stewart Lease: BULGER or STEWART UNIT Well 14-7 |
Location: T23S R30W, Sec. 7, W2 NW NE
860 South, 2190 West, from NE corner Longitude: -100.6534889 Latitude: 38.0726761 County: Finney Status: D&A |
Spud Date: 10/26/1999
Completion Date: 11/02/1999 Plugging Date: 11/02/1999 Total Depth: 4910 Form. at depth: MISSISSIPPIAN Elevation: 2860 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4740 to 4790
Formation tested: morrow | Date, Time: 11/01/1999; 22:57:46 |
|
Initial Hydro Pressure: 2370 PSI
First Initial Flow Pressure: 136 PSI First Final Flow Pressure: 146 PSI Initial Shut-in Pressure: 1484 PSI Second Initial Flow Pressure: 146 PSI Second Final Flow Pressure: 152 PSI Final Shut-in Pressure: 1426 PSI Final Hydro Pressure: 2293 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 240 ft. Drill Pipe Length: 4660 ft. |
|
Initial Flow: Pcker Failure at open pulled and reset, tried to fail again set more weight on tool, packer held. 1 1/2"" blow died back to 1 1/4"" Initial Shut-in: No return Final Flow: No blow Final Shut-in: No return |
|
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 280 of Total Fluid 240 of Fluid in Drill Collars 40 of Fluid in Drill Pipe 280 of drilg mud 100% mud | |
| View Pressures | No Recovery Gas data. |