Drill Stem Tests Database
Specific Well--15-033-21031
API: 15-033-21031
Operator: PINTAIL PETROLEUM LTD
Field: Collier Flats Northeast
Lease: Baker Farms
Well 1
Location: T33S R19W, Sec. 19, S2 NW NW
1100 South, 660 East, from NW corner
Longitude: -99.4321451
Latitude: 37.1605298
County: Comanche
Status: D&A
Spud Date: 09/24/1999
Completion Date: 10/09/1999
Plugging Date: 10/09/1999
Total Depth: 6116
Form. at depth: VIOLA
Elevation: 1958 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5170 to 5260
Formation tested: (upper)Miss.
Date, Time: 10/04/1999; 01:33:33
Initial Hydro Pressure: 2583 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 42 PSI
Initial Shut-in Pressure: 1178 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 54 PSI
Final Shut-in Pressure: 1524 PSI
Final Hydro Pressure: 2510 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294 ft.
Drill Pipe Length: 5392 ft.
Initial Flow: Fair blow built to bottom of bucket in 1 min. 40 secs. Initial Shut-in: Bled down for 3 mins.Very slight - blow back surface blow.
Final Flow: Strong blow b.o.b in 30 sec. gas to surface in 4 min.
Final Shut-in: Bled down for 10 mins. no blow back
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
5444 of Gas in pipe
124 of Very slight gas cut mud 4% gas 96% mud
View Pressures View Recovery Gas