|
API: 15-033-21031
Operator: PINTAIL PETROLEUM LTD Field: Collier Flats Northeast Lease: Baker Farms Well 1 |
Location: T33S R19W, Sec. 19, S2 NW NW
1100 South, 660 East, from NW corner Longitude: -99.4321451 Latitude: 37.1605298 County: Comanche Status: D&A |
Spud Date: 09/24/1999
Completion Date: 10/09/1999 Plugging Date: 10/09/1999 Total Depth: 6116 Form. at depth: VIOLA Elevation: 1958 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5170 to 5260
Formation tested: (upper)Miss. | Date, Time: 10/04/1999; 01:33:33 |
|
Initial Hydro Pressure: 2583 PSI
First Initial Flow Pressure: 44 PSI First Final Flow Pressure: 42 PSI Initial Shut-in Pressure: 1178 PSI Second Initial Flow Pressure: 43 PSI Second Final Flow Pressure: 54 PSI Final Shut-in Pressure: 1524 PSI Final Hydro Pressure: 2510 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 294 ft. Drill Pipe Length: 5392 ft. |
|
Initial Flow: Fair blow built to bottom of bucket in 1 min. 40 secs. Initial Shut-in: Bled down for 3 mins.Very slight - blow back surface blow. Final Flow: Strong blow b.o.b in 30 sec. gas to surface in 4 min. Final Shut-in: Bled down for 10 mins. no blow back |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 125 of Total Fluid 125 of Fluid in Drill Collars 5444 of Gas in pipe 124 of Very slight gas cut mud 4% gas 96% mud | |
| View Pressures | View Recovery Gas |