API: 15-097-21444
Operator: Vincent Oil Corp. Field: Nichols Lease: Yost Well 1-29 |
Location: T29S R18W, Sec. 29, N2 NE NW
354 South, 3403 West, from NE corner Longitude: -99.3134755 Latitude: 37.4974298 County: Kiowa Status: GAS |
Spud Date: 20-AUG-99
Completion Date: 02-SEP-99 Plugging Date: Total Depth: 4940 Form. at depth: MISSISSIPPIAN Elevation: 2215 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4300 to 4340
Formation tested: Lansing | Date, Time: 27-AUG-99; 07:25:08 |
Initial Hydro Pressure: 2101 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 20 PSI Initial Shut-in Pressure: 692 PSI Second Initial Flow Pressure: 21 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 674 PSI Final Hydro Pressure: 2110 PSI |
Tool Data Hole Size: 6.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4296 ft. |
Initial Flow: Weak building to a strong blow in 1 min. Final Flow: Strong blow throughout |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Pipe 645 of Gas in pipe 15 of Mud with show of oil in tool | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4388 to 4408
Formation tested: lansing | Date, Time: 28-AUG-99; 01:42:42 |
Initial Hydro Pressure: 2088 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 55 PSI Initial Shut-in Pressure: 1240 PSI Second Initial Flow Pressure: 48 PSI Second Final Flow Pressure: 74 PSI Final Shut-in Pressure: 1210 PSI Final Hydro Pressure: 2072 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4386 ft. |
Initial Flow: Strong blow in 1 min. Final Flow: Strong blow throughout |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 130 of Total Fluid 130 of Fluid in Drill Pipe 130 of Muddy water 40%mud 60%water 23000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4410 to 4470
Formation tested: lansing | Date, Time: 28-AUG-99; 17:16:27 |
Initial Hydro Pressure: 2090 PSI
First Initial Flow Pressure: 49 PSI First Final Flow Pressure: 108 PSI Initial Shut-in Pressure: 1326 PSI Second Initial Flow Pressure: 115 PSI Second Final Flow Pressure: 209 PSI Final Shut-in Pressure: 1306 PSI Final Hydro Pressure: 2107 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4420 ft. |
Initial Flow: Strong blow throughout Final Flow: Strong blow gas to surface |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 390 of Total Fluid 390 of Fluid in Drill Pipe 390 of water 23000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4538 to 4560
Formation tested: lansing | Date, Time: 29-AUG-99; 14:24:34 |
Initial Hydro Pressure: 2173 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 24 PSI Initial Shut-in Pressure: 499 PSI Second Initial Flow Pressure: 27 PSI Second Final Flow Pressure: 34 PSI Final Shut-in Pressure: 524 PSI Final Hydro Pressure: 2147 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4545 ft. |
Initial Flow: Weak building to a strong blow in 20 mins. Final Flow: Strong blow throughout |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 65 of Total Fluid 65 of Fluid in Drill Pipe 1320 of Gas in pipe 65 of Oil and gas cut mud 6% gas 12% oil 82% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4742 to 4765
Formation tested: marmaton | Date, Time: 30-AUG-99; 19:04:32 |
Initial Hydro Pressure: 2275 PSI
First Initial Flow Pressure: 12 PSI First Final Flow Pressure: 14 PSI Initial Shut-in Pressure: 1233 PSI Second Initial Flow Pressure: 16 PSI Second Final Flow Pressure: 16 PSI Final Shut-in Pressure: 1090 PSI Final Hydro Pressure: 2273 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4729 ft. |
Initial Flow: Strong blow in 5 mins. Final Flow: Strong blow throughout |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 1790 of Gas in pipe 10 of Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 4768 to 4940
Formation tested: pawnee,cher.,miss | Date, Time: 01-SEP-99; 03:14:22 |
Initial Hydro Pressure: 2319 PSI
First Initial Flow Pressure: 198 PSI First Final Flow Pressure: 164 PSI Initial Shut-in Pressure: 1270 PSI Second Initial Flow Pressure: 157 PSI Second Final Flow Pressure: 154 PSI Final Shut-in Pressure: 1271 PSI Final Hydro Pressure: 2296 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4760 ft. |
Initial Flow: Strong blow gas to surface in 5 mins. Final Flow: Gas to surface |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: gas sample Gas Recovery: Comments: | |
Recovery 125 of Total Fluid 125 of Fluid in Drill Pipe 125 of Gas cut mud 10% gas 90% mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |