Drill Stem Tests Database
Specific Well--15-097-21444
API: 15-097-21444
Operator: Vincent Oil Corp.
Field: Nichols
Lease: Yost
Well 1-29
Location: T29S R18W, Sec. 29, N2 NE NW
354 South, 3403 West, from NE corner
Longitude: -99.3134755
Latitude: 37.4974298
County: Kiowa
Status: GAS
Spud Date: 20-AUG-99
Completion Date: 02-SEP-99
Plugging Date:
Total Depth: 4940
Form. at depth: MISSISSIPPIAN
Elevation: 2215 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4300 to 4340
Formation tested: Lansing
Date, Time: 27-AUG-99; 07:25:08
Initial Hydro Pressure: 2101 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 20 PSI
Initial Shut-in Pressure: 692 PSI
Second Initial Flow Pressure: 21 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 674 PSI
Final Hydro Pressure: 2110 PSI
Tool Data
Hole Size: 6.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4296 ft.
Initial Flow: Weak building to a strong blow in 1 min.
Final Flow: Strong blow throughout
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Pipe
645 of Gas in pipe
15 of Mud with show of oil in tool
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4388 to 4408
Formation tested: lansing
Date, Time: 28-AUG-99; 01:42:42
Initial Hydro Pressure: 2088 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 55 PSI
Initial Shut-in Pressure: 1240 PSI
Second Initial Flow Pressure: 48 PSI
Second Final Flow Pressure: 74 PSI
Final Shut-in Pressure: 1210 PSI
Final Hydro Pressure: 2072 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4386 ft.
Initial Flow: Strong blow in 1 min.
Final Flow: Strong blow throughout
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Pipe
130 of Muddy water 40%mud 60%water
23000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4410 to 4470
Formation tested: lansing
Date, Time: 28-AUG-99; 17:16:27
Initial Hydro Pressure: 2090 PSI
First Initial Flow Pressure: 49 PSI
First Final Flow Pressure: 108 PSI
Initial Shut-in Pressure: 1326 PSI
Second Initial Flow Pressure: 115 PSI
Second Final Flow Pressure: 209 PSI
Final Shut-in Pressure: 1306 PSI
Final Hydro Pressure: 2107 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4420 ft.
Initial Flow: Strong blow throughout
Final Flow: Strong blow gas to surface
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
390 of Total Fluid
390 of Fluid in Drill Pipe
390 of water
23000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4538 to 4560
Formation tested: lansing
Date, Time: 29-AUG-99; 14:24:34
Initial Hydro Pressure: 2173 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 499 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 34 PSI
Final Shut-in Pressure: 524 PSI
Final Hydro Pressure: 2147 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4545 ft.
Initial Flow: Weak building to a strong blow in 20 mins.
Final Flow: Strong blow throughout
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
65 of Fluid in Drill Pipe
1320 of Gas in pipe
65 of Oil and gas cut mud 6% gas 12% oil 82% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4742 to 4765
Formation tested: marmaton
Date, Time: 30-AUG-99; 19:04:32
Initial Hydro Pressure: 2275 PSI
First Initial Flow Pressure: 12 PSI
First Final Flow Pressure: 14 PSI
Initial Shut-in Pressure: 1233 PSI
Second Initial Flow Pressure: 16 PSI
Second Final Flow Pressure: 16 PSI
Final Shut-in Pressure: 1090 PSI
Final Hydro Pressure: 2273 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4729 ft.
Initial Flow: Strong blow in 5 mins.
Final Flow: Strong blow throughout
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Pipe
1790 of Gas in pipe
10 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 4768 to 4940
Formation tested: pawnee,cher.,miss
Date, Time: 01-SEP-99; 03:14:22
Initial Hydro Pressure: 2319 PSI
First Initial Flow Pressure: 198 PSI
First Final Flow Pressure: 164 PSI
Initial Shut-in Pressure: 1270 PSI
Second Initial Flow Pressure: 157 PSI
Second Final Flow Pressure: 154 PSI
Final Shut-in Pressure: 1271 PSI
Final Hydro Pressure: 2296 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4760 ft.
Initial Flow: Strong blow gas to surface in 5 mins.
Final Flow: Gas to surface
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples: gas sample
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Pipe
125 of Gas cut mud 10% gas 90% mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.