|
API: 15-033-21038
Operator: Hummon Corp. Field: Nescatunga Lease: Keller Well 1 |
Location: T32S R18W, Sec. 22, E2 SE
1329 North, 672 West, from SE corner Longitude: -99.2574894 Latitude: 37.2410247 County: Comanche Status: GAS |
Spud Date: 20-OCT-99
Completion Date: 04-NOV-99 Plugging Date: Total Depth: 5679 Form. at depth: VIOLA Elevation: 2073 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5012 to 5076
Formation tested: Pawnee/Ft.Scott | Date, Time: 29-OCT-99; 07:39:49 |
|
Initial Hydro Pressure: 2428 PSI
First Initial Flow Pressure: 65 PSI First Final Flow Pressure: 68 PSI Initial Shut-in Pressure: 1845 PSI Second Initial Flow Pressure: 65 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: 1850 PSI Final Hydro Pressure: 2385 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5011 ft. |
|
Initial Flow: Strong blow bottom of bucket in 1 min. gas to surface in 14 mins. Initial Shut-in: Weak blow. (1"") Final Flow: Strong blow (see gas volume report) Final Shut-in: No blow |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 10 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 100 of Total Fluid 100 of Fluid in Drill Pipe 100 of Drilling mud 6000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5065 to 5102
Formation tested: Cherokee | Date, Time: 30-OCT-99; 05:40:41 |
|
Initial Hydro Pressure: 2450 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 428 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 549 PSI Final Hydro Pressure: 2424 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5073 ft. |
|
Initial Flow: Weak to fair blow (slow increase to 8"") Initial Shut-in: No blow. Fina Flow: Strong blow bottom of bucket in 50 secs. Final Shut-in: No blow |
|
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 8 Samples: none Gas Recovery: Comments: | |
|
Recovery 15 of Total Fluid 15 of Fluid in Drill Pipe 120 of Gas in pipe. 15 of Drilling mud 6000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5297 to 5333
Formation tested: Miss. | Date, Time: 31-OCT-99; 17:57:21 |
|
Initial Hydro Pressure: 2547 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 379 PSI Second Initial Flow Pressure: 22 PSI Second Final Flow Pressure: 28 PSI Final Shut-in Pressure: 531 PSI Final Hydro Pressure: 2518 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5293 ft. |
|
Initial Flow: Fair to strong blow bottom of bucket in 14 mins. Initial Shut-in: No blow. Final Flow: Fair to strong blow bottom of bucket in 7 mins. Final Shut-in: No blow |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Pipe 300 of Gas in pipe. 30 of Drilling mud 8000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |