API: 15-095-21754
Operator: MTM PETROLEUM, INC. Field: Settle Lease: MAYER Well 1 |
Location: T29S R7W, Sec. 20, W2 NW SE
1980 North, 2310 West, from SE corner Longitude: -98.1070192 Latitude: 37.5070444 County: Kingman Status: OIL |
Spud Date: 22-JUL-99
Completion Date: 07-AUG-99 Plugging Date: 11-JUL-02 Total Depth: 4541 Form. at depth: MISSISSIPPIAN Elevation: 1567 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4141 to 4169
Formation tested: Missippian | Date, Time: 28-JUL-99; 02:58:10 |
Initial Hydro Pressure: 2047 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 20 PSI Initial Shut-in Pressure: 147 PSI Second Initial Flow Pressure: 20 PSI Second Final Flow Pressure: 22 PSI Final Shut-in Pressure: 173 PSI Final Hydro Pressure: 2029 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 233.18 ft. Drill Pipe Length: ft. |
Initial Flow: Fair blow built to bottom of bucket in 20 mins. Initial Shut-in: Bled down for 2 mins.no blow back. Final Flow: Fair blow built to 6 1/2"" in water Final Shut-in: Bled down for 5 mins. no blow back |
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 220 of Gas in pipe 30 of Very slight gas cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4187 to 4199
Formation tested: Miss | Date, Time: 28-JUL-99; 16:49:48 |
Initial Hydro Pressure: 2084 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 50 PSI Initial Shut-in Pressure: 1089 PSI Second Initial Flow Pressure: 29 PSI Second Final Flow Pressure: 73 PSI Final Shut-in Pressure: 1108 PSI Final Hydro Pressure: 2021 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 233.18 ft. Drill Pipe Length: ft. |
IF:Strong blow b.o.b in 15 sec. ISI:Bled down for 5 mins.no blow back. FF:Strong blow b.o.b in 15 sec.G.T.S less than 1 min.Gauge gas. FSI:Bled down for 10 mins.no blow back. | |
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 193 of Total Fluid 193 of Fluid in Drill Collars 3976 of Gas in pipe 20 of Heavy gas and oil cut mud water 60 of Oil and water cut gassy mud 60 of Slight oil and gas cut muddy water 53 of Heavy gas cut oil & water 37%g 18%o 30%w 15%m 100000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4514 to 4541
Formation tested: Simpson sd. | Date, Time: 30-JUL-99; 06:15:47 |
Initial Hydro Pressure: 2264 PSI
First Initial Flow Pressure: 559 PSI First Final Flow Pressure: 1420 PSI Initial Shut-in Pressure: 1659 PSI Second Initial Flow Pressure: 1434 PSI Second Final Flow Pressure: 1648 PSI Final Shut-in Pressure: 1661 PSI Final Hydro Pressure: 2274 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 233.18 ft. Drill Pipe Length: 4280 ft. |
Initial Flow: Strong blow bottom of bucket in 30 secs. gas to surface in 23 mins. Initial Shut-in: Bled down for 20 mins. back to bottom of bucket in 5 mins. Final Slow: Strong blow bottom of bucket in 15 secs. gauge gas Final Shut-in: Bled down for 60 mins. built back to bottom of bucket in 1 mins. |
|
Bottom Hole Temperature: 144 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 4169 of Total Fluid 233 of Fluid in Drill Collars 3936 of Fluid in Drill Pipe 344 of Gas in pipe 3469 of Free oil 700 of Salt water 70000 of Salinity (PPM) 40 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |