Drill Stem Tests Database
Specific Well--15-171-20538
API: 15-171-20538
Operator: SAGEBRUSH OPERATING
Field: Wildcat
Lease: Dearden
Well 1-7
Location: T19S R31W, Sec. 7, SE SE
500 North, 400 West, from SE corner
Longitude: -100.7787
Latitude: 38.41164
County: Scott
Status: GAS-P&A
Spud Date: 28-AUG-99
Completion Date: 06-SEP-99
Plugging Date: 24-JUN-09
Total Depth: 4712
Form. at depth: ARBUCKLE
Elevation: 2982 KB
Drill Stem Test mismarked 7 16S 31W. --CB 11/1/01

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4216 to 4232
Formation tested: KC - J
Date, Time: 03-SEP-99; 15:29:57
Initial Hydro Pressure: 2022 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 58 PSI
Initial Shut-in Pressure: 1108 PSI
Second Initial Flow Pressure: 61 PSI
Second Final Flow Pressure: 136 PSI
Final Shut-in Pressure: 1106 PSI
Final Hydro Pressure: 1976 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: ft.
Drill Pipe Length: 4199 ft.
Initial Flow: 1/4"" at open slow buildt o 7"" Initial Shut-in: No return
Final Flow: Surface blow in 7 1/2 mins. built to 7""
Final Shut-in: No return
Bottom Hole Temperature: 144 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
250 of Total Fluid
250 of Fluid in Drill Pipe
70 of Mud cut water 60% water 40% mud oil scum
180 of Slight mud cut water
22500 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4371 to 4391
Formation tested: marmaton
Date, Time: 04-SEP-99; 15:10:01
Initial Hydro Pressure: 2086 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 1025 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 24 PSI
Final Shut-in Pressure: 934 PSI
Final Hydro Pressure: 2022 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: ft.
Drill Pipe Length: 4354 ft.
Initial Flow: 1/2"" blow died in 27 mins. Initial Shut-in: No return
Final Flow: No blow
Final Shut-in: No return
Bottom Hole Temperature: 133 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
12 of Total Fluid
12 of Fluid in Drill Pipe
12 of Drilling mud with oil scum
View Pressures No Recovery Gas data.