|
API: 15-171-20538
Operator: SAGEBRUSH OPERATING Field: Wildcat Lease: Dearden Well 1-7 |
Location: T19S R31W, Sec. 7, SE SE
500 North, 400 West, from SE corner Longitude: -100.7787 Latitude: 38.41164 County: Scott Status: GAS-P&A |
Spud Date: 28-AUG-99
Completion Date: 06-SEP-99 Plugging Date: 24-JUN-09 Total Depth: 4712 Form. at depth: ARBUCKLE Elevation: 2982 KB |
| Drill Stem Test mismarked 7 16S 31W. --CB 11/1/01 | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4216 to 4232
Formation tested: KC - J | Date, Time: 03-SEP-99; 15:29:57 |
|
Initial Hydro Pressure: 2022 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 58 PSI Initial Shut-in Pressure: 1108 PSI Second Initial Flow Pressure: 61 PSI Second Final Flow Pressure: 136 PSI Final Shut-in Pressure: 1106 PSI Final Hydro Pressure: 1976 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4199 ft. |
|
Initial Flow: 1/4"" at open slow buildt o 7"" Initial Shut-in: No return Final Flow: Surface blow in 7 1/2 mins. built to 7"" Final Shut-in: No return |
|
|
Bottom Hole Temperature: 144 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 250 of Total Fluid 250 of Fluid in Drill Pipe 70 of Mud cut water 60% water 40% mud oil scum 180 of Slight mud cut water 22500 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4371 to 4391
Formation tested: marmaton | Date, Time: 04-SEP-99; 15:10:01 |
|
Initial Hydro Pressure: 2086 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 1025 PSI Second Initial Flow Pressure: 22 PSI Second Final Flow Pressure: 24 PSI Final Shut-in Pressure: 934 PSI Final Hydro Pressure: 2022 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4354 ft. |
|
Initial Flow: 1/2"" blow died in 27 mins. Initial Shut-in: No return Final Flow: No blow Final Shut-in: No return |
|
|
Bottom Hole Temperature: 133 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 12 of Total Fluid 12 of Fluid in Drill Pipe 12 of Drilling mud with oil scum | |
| View Pressures | No Recovery Gas data. |