API: 15-171-20538
Operator: SAGEBRUSH OPERATING Field: Wildcat Lease: Dearden Well 1-7 |
Location: T19S R31W, Sec. 7, SE SE
500 North, 400 West, from SE corner Longitude: -100.7787 Latitude: 38.41164 County: Scott Status: GAS-P&A |
Spud Date: 28-AUG-99
Completion Date: 06-SEP-99 Plugging Date: 24-JUN-09 Total Depth: 4712 Form. at depth: ARBUCKLE Elevation: 2982 KB |
Drill Stem Test mismarked 7 16S 31W. --CB 11/1/01 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4216 to 4232
Formation tested: KC - J | Date, Time: 03-SEP-99; 15:29:57 |
Initial Hydro Pressure: 2022 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 58 PSI Initial Shut-in Pressure: 1108 PSI Second Initial Flow Pressure: 61 PSI Second Final Flow Pressure: 136 PSI Final Shut-in Pressure: 1106 PSI Final Hydro Pressure: 1976 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4199 ft. |
Initial Flow: 1/4"" at open slow buildt o 7"" Initial Shut-in: No return Final Flow: Surface blow in 7 1/2 mins. built to 7"" Final Shut-in: No return |
|
Bottom Hole Temperature: 144 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 250 of Total Fluid 250 of Fluid in Drill Pipe 70 of Mud cut water 60% water 40% mud oil scum 180 of Slight mud cut water 22500 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4371 to 4391
Formation tested: marmaton | Date, Time: 04-SEP-99; 15:10:01 |
Initial Hydro Pressure: 2086 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 1025 PSI Second Initial Flow Pressure: 22 PSI Second Final Flow Pressure: 24 PSI Final Shut-in Pressure: 934 PSI Final Hydro Pressure: 2022 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4354 ft. |
Initial Flow: 1/2"" blow died in 27 mins. Initial Shut-in: No return Final Flow: No blow Final Shut-in: No return |
|
Bottom Hole Temperature: 133 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 12 of Total Fluid 12 of Fluid in Drill Pipe 12 of Drilling mud with oil scum | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |