Drill Stem Tests Database
Specific Well--15-081-21247
API: 15-081-21247
Operator: JOHN O. FARMER, INC.
Field: Radio Tower
Lease: Patterson
Well 1-33
Location: T30S R31W, Sec. 33, SE NE
1980 South, 660 West, from NE corner
Longitude: -100.7089739
Latitude: 37.3966379
County: Haskell
Status: GAS
Spud Date: 30-AUG-99
Completion Date: 23-SEP-99
Plugging Date:
Total Depth: 5597
Form. at depth: MISSISSIPPIAN
Elevation: 2844 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5315 to 5430
Formation tested: Lwr Morrow
Date, Time: 07-SEP-99; 23:37:28
Initial Hydro Pressure: 2712 PSI
First Initial Flow Pressure: 945 PSI
First Final Flow Pressure: 514 PSI
Initial Shut-in Pressure: 1684 PSI
Second Initial Flow Pressure: 488 PSI
Second Final Flow Pressure: 384 PSI
Final Shut-in Pressure: 1686 PSI
Final Hydro Pressure: 2587 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 5060 ft.
Initial Flow: Strong blow off bottom immediately Gas to surface in 4 mins. Initial Shut-in: No return blow
Final Flow: Strong return gauged 9#psi on 1 1/2"" = 1198 mcf/day
Final Shut-in: No return blow
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Collars
190 of Drilling mud
View Pressures View Recovery Gas