|
API: 15-189-22308
Operator: Oxy USA, Inc. Field: Youngren Lease: MLP CAVNER 'A' Well 3 |
Location: T31S R38W, Sec. 31, SW NE NE SW
2275 North, 2170 East, from SW corner Longitude: -101.4940807 Latitude: 37.3071964 County: Stevens Status: OIL-P&A |
Spud Date: 18-JUN-99
Completion Date: 21-JUL-99 Plugging Date: 09-JUL-10 Total Depth: 6145 Form. at depth: ST LOUIS Elevation: 3103 KB |
| SAMPLES MARKED #3 MLP CAVNERS 'A'. This well has been referred to as the 'MLP CAVNER E1', too. | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5696 to 5708
Formation tested: Lower Morrow | Date, Time: 26-JUN-99; 06:41:21 |
|
Initial Hydro Pressure: 2871 PSI
First Initial Flow Pressure: 2287 PSI First Final Flow Pressure: 2273 PSI Initial Shut-in Pressure: 2281 PSI Second Initial Flow Pressure: 2534 PSI Second Final Flow Pressure: 2538 PSI Final Shut-in Pressure: 2489 PSI Final Hydro Pressure: 2664 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 593 ft. Drill Pipe Length: 5077 ft. |
|
Initial Flow: Strong blow bottom of bucket in 5 mins. Initial Shut-in: Bled off 2"" no blow back Final Flow: No blow |
|
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Collars 90 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5696 to 5708
Formation tested: Lower Morrow | Date, Time: 27-JUN-99; 01:35:37 |
|
Initial Hydro Pressure: 2690 PSI
First Initial Flow Pressure: 291 PSI First Final Flow Pressure: 2249 PSI Initial Shut-in Pressure: 2421 PSI Second Initial Flow Pressure: 461 PSI Second Final Flow Pressure: 444 PSI Final Shut-in Pressure: 1662 PSI Final Hydro Pressure: 2658 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 593 ft. Drill Pipe Length: 5077 ft. |
|
Initial Flow: Strong blow bottom of bucket in 1 min Initial Shut-in: Bled off blow no blow back Final Flow: No blow bottom of bucket in 7 mins. lost packer seat bled off got packer seat again 2ft. lower gas to surface in 42 mins. to weak to gauge gas will burn |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Yes 1 Gas Recovery: Comments: | |
|
Recovery 925 of Total Fluid 595 of Fluid in Drill Collars 330 of Fluid in Drill Pipe 925 of Gassy Mud 20% gas 80% mud | |
| View Pressures | No Recovery Gas data. |