Drill Stem Tests Database
Specific Well--15-129-21596
API: 15-129-21596
Operator: Pickerell Drilling Co.
Field: Wildcat
Lease: TORLINE 'A'
Well 1
Location: T31S R41W, Sec. 13, S2 SE NW
2310 South, 1980 East, from NW corner
Longitude: -101.7303544
Latitude: 37.3534501
County: Morton
Status: O&G-P&A
Spud Date: 12/13/1999
Completion Date: 12/31/1999
Plugging Date: 12/31/1999
Total Depth: 5510
Form. at depth: MISSISSIPPIAN
Elevation: 3352 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5134 to 5154
Formation tested: Morrow Sand
Date, Time: 12/28/1999; 02:39:08
Initial Hydro Pressure: 2438 PSI
First Initial Flow Pressure: 11 PSI
First Final Flow Pressure: 18 PSI
Initial Shut-in Pressure: 333 PSI
Second Initial Flow Pressure: 14 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 219 PSI
Final Hydro Pressure: 2424 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 237 ft.
Drill Pipe Length: 4894 ft.
Initial Flow: Weak 1"", built to 3"" in 23 minutes. Stabilized. Intial Shut-In: No Blow back.
Final Flow: Surface blow built to 3/4"" in 20 minutes. Decreased slightly in 45 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Mud
2300 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5377 to 5396
Formation tested: Morrow
Date, Time: 12/29/1999; 13:20:18
Initial Hydro Pressure: 2658 PSI
First Initial Flow Pressure: 38 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 41 PSI
Second Initial Flow Pressure: 39 PSI
Second Final Flow Pressure: 39 PSI
Final Shut-in Pressure: 40 PSI
Final Hydro Pressure: 2638 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 237 ft.
Drill Pipe Length: 5141 ft.
Initial Flow: Weak 1/4"" blow died in 25 minutes.
Final Flow: No return blow.
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Drilling Mud
View Pressures No Recovery Gas data.