Drill Stem Tests Database
Specific Well--15-055-21546-0001
API: 15-055-21546-0001
Operator: Parker and Parsley Development, LP
Field: Hugoton Gas Area
Lease: Huston
Well 3-24
Location: T24S R32W, Sec. 24, SE SE NW SE
1370 North, 1370 West, from SE corner
Longitude: -100.778498
Latitude: 37.9494533
County: Finney
Status: GAS
Spud Date: 03/19/1997
Completion Date: 04/07/1997
Plugging Date:
Total Depth: 5050
Form. at depth:
Elevation: 2894 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4887 to 49240
Formation tested: Mississippian
Date, Time: 03/12/1997; 15:55:22
Initial Hydro Pressure: 2405 PSI
First Initial Flow Pressure: 12 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 1295 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 32 PSI
Final Shut-in Pressure: 1250 PSI
Final Hydro Pressure: 2356 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 549 ft.
Drill Pipe Length: 4324 ft.
Initial Flow: Weak surface blow steady @ 1/4"" throughtout Initial Shut In:
Final Flow: No blow, flushed tool/ good surge, no return blow
Final Shut In: No blow
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Drilling Mud
1500 of Salinity (PPM)
View Pressures View Recovery Gas