Drill Stem Tests Database
Specific Well--15-191-22340
API: 15-191-22340
Operator: Docking Development Co.
Field: Toni-Mike Northeast
Lease: O'Hara
Well 11
Location: T32S R1W, Sec. 18, NW SW SE NW
3012 North, 3639 West, from SE corner
Longitude: -97.4697231
Latitude: 37.2669974
County: Sumner
Status: OIL
Spud Date: 19-JUL-99
Completion Date: 24-JUL-99
Plugging Date:
Total Depth: 3320
Form. at depth: KANSAS CITY
Elevation: 1289 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3250 to 3270
Formation tested: swope
Date, Time: 24-JUL-99; 23:09:41
Initial Hydro Pressure: 1680 PSI
First Initial Flow Pressure: 96 PSI
First Final Flow Pressure: 529 PSI
Initial Shut-in Pressure: 1216 PSI
Second Initial Flow Pressure: 554 PSI
Second Final Flow Pressure: 866 PSI
Final Shut-in Pressure: 1222 PSI
Final Hydro Pressure: 1634 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3 in.
Drill Collar Length: 316.48 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 1 min. 18 secs. Initial Shut-in: Bled down for 2 mins. built back to 7""
Final Flow: Strong blow bottom of bucket in 1:40 mins.
Final Shut-In: Bled down for 4-1/2 mins built back to
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1767 of Total Fluid
316 of Fluid in Drill Collars
1450 of Fluid in Drill Pipe
757 of Gas in pipe
45 of Free Oil
75 of Slight oil and gas cut muddy water
1617 of Slight mud cut water
30 of Heavy mud cut gassy mud
160000 of Salinity (PPM)
40 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3300 to 3320
Formation tested: Hertha
Date, Time: 25-JUL-99; 20:04:44
Initial Hydro Pressure: 1731 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 47 PSI
Initial Shut-in Pressure: 244 PSI
Second Initial Flow Pressure: 61 PSI
Second Final Flow Pressure: 76 PSI
Final Shut-in Pressure: 1114 PSI
Final Hydro Pressure: 1619 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3 in.
Drill Collar Length: 316.48 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 3"" in water Initial Shut-in: Bled down for 2 mins. no blow back
Final Flow: Weak blow built to 5"" in water
Final Shut-in: Bled down for 2 mins. no blow back
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
151 of Gas in pipe
30 of Slight water and oil cut mud
30 of Slight gassy oil and water cut mud
60 of Slight mud cut water 80% water 20% mud
70000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.