Drill Stem Tests Database
Specific Well--15-025-21196
API: 15-025-21196
Operator: ZINKE & TRUMBO
Field: Wildcat
Lease: Bouziden
Well 1-14
Location: T34S R21W, Sec. 14, SE NW
1980 South, 1980 East, from NW corner
Longitude: -99.571028
Latitude: 37.0847719
County: Clark
Status: D&A
Spud Date: 27-NOV-99
Completion Date: 10-DEC-99
Plugging Date: 11-DEC-99
Total Depth: 5600
Form. at depth: MISSISSIPPIAN
Elevation: 1784 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5347 to 5436
Formation tested: Morrow
Date, Time: 07-DEC-99; 08:37:45
Initial Hydro Pressure: 2657 PSI
First Initial Flow Pressure: 42 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 148 PSI
Second Initial Flow Pressure: 50 PSI
Second Final Flow Pressure: 63 PSI
Final Shut-in Pressure: 104 PSI
Final Hydro Pressure: 2639 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 536 ft.
Drill Pipe Length: 4860 ft.
Initial Flow: Weak building to 2"" weak blow
Final Flow: Weak building to 3"" steady weak blow
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
55 of Total Fluid
55 of Fluid in Drill Collars
55 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5468 to 5483
Formation tested: Lower Morrow
Date, Time: 08-DEC-99; 02:48:57
Initial Hydro Pressure: 2747 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 2025 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 26 PSI
Final Shut-in Pressure: 2035 PSI
Final Hydro Pressure: 2705 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 536 ft.
Drill Pipe Length: 4923 ft.
Initial Flow: Weak-building to fair blow-bottom of bucket in 8 minutes. Initial Shut-In: Bled off blow-no blow back
Final Flow: Strong-bottom of bucket in 2 minutes Gas to surface in 15 minutes.
Final Shut-In: Bled off blow-no blow back
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples: Bottle filled
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Drilling mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.