Drill Stem Tests Database
Specific Well--15-051-25012
API: 15-051-25012
Operator: MURFIN DRILLING CO INC
Field: Lucky Lady
Lease: KOHL
Well 1-19
Location: T11S R19W, Sec. 19, E2 NW SW
2020 North, 950 East, from SW corner
Longitude: -99.4781725
Latitude: 39.0796488
County: Ellis
Status: OIL-P&A
Spud Date: 29-OCT-99
Completion Date: 22-NOV-99
Plugging Date: 21-JAN-04
Total Depth: 3680
Form. at depth: ARBUCKLE
Elevation: 1985 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3273 to 3342
Formation tested: Lansing-B-C-D
Date, Time: 03-NOV-99; 18:32:00
Initial Hydro Pressure: 1615 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 63 PSI
Initial Shut-in Pressure: 565 PSI
Second Initial Flow Pressure: 63 PSI
Second Final Flow Pressure: 95 PSI
Final Shut-in Pressure: 563 PSI
Final Hydro Pressure: 1579 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3025 ft.
Initial Flow: Weak building to 1 1/2""
Final Flow: Weak building to 1/4""
Bottom Hole Temperature: 99 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
5 of Oil cut mud 10% oil 90% mud
120 of Mud with oil spots
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3377 to 3478
Formation tested: H-I-J-K-L LKC
Date, Time: 04-NOV-99; 13:26:42
Initial Hydro Pressure: 1705 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 961 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 42 PSI
Final Shut-in Pressure: 676 PSI
Final Hydro Pressure: 1664 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3147 ft.
Initial Flow: Weak building to 1/8""
Final Flow: Weak steady surface blow
Bottom Hole Temperature: 101 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Heavy oil cut mud 10% oil 90% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3529 to 3570
Formation tested: Arbuckle
Date, Time: 05-NOV-99; 07:38:52
Initial Hydro Pressure: 1787 PSI
First Initial Flow Pressure: 124 PSI
First Final Flow Pressure: 327 PSI
Initial Shut-in Pressure: 1021 PSI
Second Initial Flow Pressure: 340 PSI
Second Final Flow Pressure: 533 PSI
Final Shut-in Pressure: 949 PSI
Final Hydro Pressure: 1735 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3276 ft.
Initial Flow: Strong bottom of bucket in 4 min Initial Shut-in: Bled off blow-no blow back
Final Flow: Strong bottom of bucket in 6 min
Final Shut-in: Bled off blow-no blow back
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1250 of Total Fluid
240 of Fluid in Drill Collars
1010 of Fluid in Drill Pipe
1010 of Clean heavy oil
240 of Mud cut heavy oil 80% oil 20% mud
20 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3570 to 3580
Formation tested: Arbuckle
Date, Time: 06-NOV-99; 22:52:41
Initial Hydro Pressure: 1792 PSI
First Initial Flow Pressure: 51 PSI
First Final Flow Pressure: 235 PSI
Initial Shut-in Pressure: 992 PSI
Second Initial Flow Pressure: 238 PSI
Second Final Flow Pressure: 416 PSI
Final Shut-in Pressure: 940 PSI
Final Hydro Pressure: 1750 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3337 ft.
Initial Flow: Strong bottom of bucket in 4 min Initial Shut-in: Bled off blow-no blow back
Final Flow: Strong bottom of bucket in 9 min
Final Shut-in: Bled off blow-no blow back
Bottom Hole Temperature: 108 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1046 of Total Fluid
240 of Fluid in Drill Collars
806 of Fluid in Drill Pipe
1036 of Clean heavy oil
10 of Muddy water
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.