|
API: 15-135-24082
Operator: McCoy Petroleum Corp. Field: Laird Lease: HARPER 'C' Well 1-9 |
Location: T19S R25W, Sec. 9, NW NW
4606 North, 4635 West, from SE corner Longitude: -100.0975665 Latitude: 38.4192624 County: Ness Status: OIL-P&A |
Spud Date: 15-OCT-99
Completion Date: 23-NOV-99 Plugging Date: 12-AUG-10 Total Depth: 4504 Form. at depth: MISSISSIPPIAN Elevation: 2514 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4390 to 4435
Formation tested: Ft Scott | Date, Time: 24-OCT-99; 13:41:34 |
|
Initial Hydro Pressure: 2176 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 164 PSI Second Initial Flow Pressure: 26 PSI Second Final Flow Pressure: 35 PSI Final Shut-in Pressure: 189 PSI Final Hydro Pressure: 2146 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3923 ft. |
|
Initial Flow: Weak 1/2"" blow built to 3"" Initial Shut-in: No blow back Final Flow: Weak 1/2"" blow built to 3"" Final Shut-in: No blow back |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Pipe 30 of Oil Stained Mud | |
| View Pressures | No Recovery Gas data. |