Drill Stem Tests Database
Specific Well--15-171-20539
API: 15-171-20539
Operator: Wabash Energy Corp.
Field: Beckley North
Lease: Schowalter
Well 3
Location: T18S R32W, Sec. 12, NE NW NW
4987 North, 4276 West, from SE corner
Longitude: -100.8108992
Latitude: 38.5110616
County: Scott
Status: OIL
Spud Date: 30-NOV-99
Completion Date: 09-DEC-99
Plugging Date:
Total Depth: 4660
Form. at depth: MISSISSIPPIAN
Elevation: 2972 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4549 to 4568
Formation tested: Cherokee
Date, Time: 07-DEC-99; 13:30:53
Initial Hydro Pressure: 2254 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 62 PSI
Initial Shut-in Pressure: 1025 PSI
Second Initial Flow Pressure: 67 PSI
Second Final Flow Pressure: 140 PSI
Final Shut-in Pressure: 1017 PSI
Final Hydro Pressure: 2217 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4503 ft.
Initial Flow: Fair to strong blow off bottom in 13 minutes. Initial Shut-In: Surface blow built to 3"".
Final Flow: Fair to strong blow off bottom
Final Shut-In: Surface blow built to 3"".
Bottom Hole Temperature: 136 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
330 of Total Fluid
30 of Fluid in Drill Collars
300 of Fluid in Drill Pipe
270 of Clean gassy oil
30 of Gassy mud cut oil
30 of Gassy slightly oil cut mud
30 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4530 to 4548
Formation tested: Cherokee
Date, Time: 07-FEB-00; 06:37:07
Initial Hydro Pressure: 2267 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 92 PSI
Initial Shut-in Pressure: 560 PSI
Second Initial Flow Pressure: 94 PSI
Second Final Flow Pressure: 143 PSI
Final Shut-in Pressure: 555 PSI
Final Hydro Pressure: 2155 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 4285 ft.
Initial Flow: Bottom of bucket in 16 minutes. Initial Shut-In: Bled off 2 minutes. Return in 1 minute, 1/4"". Died in 25 minutes.
Final Flow: Bottom of bucket in 8 minutes.
Final Shut-In: Bled off 2 minutes. Return in 1 minute. Built to 2"".
Bottom Hole Temperature: 131 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
360 of Total Fluid
235 of Fluid in Drill Collars
125 of Fluid in Drill Pipe
95 of Clean gassy oil
265 of Mud cut gassy oil
2500 of Salinity (PPM)
30 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4638 to 4650
Formation tested: miss
Date, Time: 08-FEB-00; 18:18:18
Initial Hydro Pressure: 2284 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 67 PSI
Initial Shut-in Pressure: 1133 PSI
Second Initial Flow Pressure: 72 PSI
Second Final Flow Pressure: 134 PSI
Final Shut-in Pressure: 1081 PSI
Final Hydro Pressure: 2264 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 4408 ft.
Intial Flow: 1/4"" open built to 2"" Initial Shutin: No return
Final Flow: Weak surface blow in 3 minutes blew throughout
Final Shutin: No return
Bottom Hole Temperature: 134 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
240 of Total Fluid
235 of Fluid in Drill Collars
5 of Fluid in Drill Pipe
65 of mud cut water 35%mud 65%water
175 of water 100%
32000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4145 to 4195
Formation tested: I-J KC
Date, Time: 05-FEB-00; 05:37:16
Initial Hydro Pressure: 2041 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 149 PSI
Initial Shut-in Pressure: 934 PSI
Second Initial Flow Pressure: 153 PSI
Second Final Flow Pressure: 243 PSI
Final Shut-in Pressure: 871 PSI
Final Hydro Pressure: 1995 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3946 ft.
Initial Flow: 1"" blow @ open, built to 9"". Initial Shut-In: No return.
Final Flow: Surface blow in 2 minutes, built to 9"".
Final Shut-In: No return.
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
600 of Total Fluid
235 of Fluid in Drill Collars
365 of Fluid in Drill Pipe
60 of Mud cut water
540 of Slightly mud cut water
29000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4199 to 4229
Formation tested: KC ""K""
Date, Time: 05-FEB-00; 20:47:20
Initial Hydro Pressure: 2025 PSI
First Initial Flow Pressure: 40 PSI
First Final Flow Pressure: 65 PSI
Initial Shut-in Pressure: 998 PSI
Second Initial Flow Pressure: 95 PSI
Second Final Flow Pressure: 128 PSI
Final Shut-in Pressure: 982 PSI
Final Hydro Pressure: 2008 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3974 ft.
Initial Flow: Too slid 7' to bottom 1 1/2"" @ open. Died back to a 1/4"". Initial Shut-In: No return.
Final Flow: 1/2"" @ open built ot 2"".
Final Shut-In: No return.
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
230 of Total Fluid
230 of Fluid in Drill Collars
230 of Mud cut water
23000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.