API: 15-171-20540
Operator: PICKRELL DRILLING COMPANY, INC. Field: Beckley North Lease: Carpenter Trust C Well 1 |
Location: T18S R32W, Sec. 11, SE NE NE
990 South, 330 West, from NE corner Longitude: -100.8155334 Latitude: 38.5091647 County: Scott Status: D&A |
Spud Date: 02-JUN-00
Completion Date: 11-JUN-00 Plugging Date: 11-JUN-00 Total Depth: 4630 Form. at depth: MISSISSIPPIAN Elevation: 2974 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4470 to 4522
Formation tested: Ft.Scott | Date, Time: 08-JUN-00; 00:25:19 |
Initial Hydro Pressure: 2200 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 82 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 35 PSI Final Shut-in Pressure: 80 PSI Final Hydro Pressure: 2194 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 180 ft. Drill Pipe Length: 4280 ft. |
IFP-very weak blow throughout 1/4""blow FFP-no blow,flushed tool. | |
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of ocm 6%oil 94%mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4557 to 4600
Formation tested: Johnson zn.& Miss | Date, Time: 09-JUN-00; 22:19:05 |
Initial Hydro Pressure: 2268 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 45 PSI Second Initial Flow Pressure: 21 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 36 PSI Final Hydro Pressure: 2258 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.2 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 180 ft. Drill Pipe Length: 4375 ft. |
Initial Flow: Very weak blow, died in 5 minutes. Final Flow: No blow. Flushed tool. |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Mud w/show of oil in tool | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |