API: 15-033-21041
Operator: Samuel Gary Jr. and Assoc., Inc. Field: Wildcat Lease: Linda Well 26-2 |
Location: T32S R19W, Sec. 26, E2 NW NE
4632 North, 1610 West, from SE corner Longitude: -99.351415 Latitude: 37.2348443 County: Comanche Status: GAS |
Spud Date: 14-NOV-99
Completion Date: 24-FEB-00 Plugging Date: Total Depth: 5960 Form. at depth: ARBUCKLE Elevation: 1991 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5126 to 5180
Formation tested: Miss. | Date, Time: 22-NOV-99; 07:36:33 |
Initial Hydro Pressure: 2516 PSI
First Initial Flow Pressure: 298 PSI First Final Flow Pressure: 281 PSI Initial Shut-in Pressure: 1824 PSI Second Initial Flow Pressure: 399 PSI Second Final Flow Pressure: 210 PSI Final Shut-in Pressure: 1802 PSI Final Hydro Pressure: 2437 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 295 ft. Drill Pipe Length: 4834 ft. |
Initial Flow: Strong blow bottom of bucket in 5-10 secs. (see gas volume report) Initial Shut-in: No blow Final Flow: Strong blow (see gas volume report) Final Shut-in: No blow |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 16 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 325 of Total Fluid 295 of Fluid in Drill Collars 30 of Fluid in Drill Pipe 90 of Drilling mud 235 of Slight water cut mud 8% water 92% mud 4000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5766 to 5791
Formation tested: Viola | Date, Time: 25-NOV-99; 04:14:00 |
Initial Hydro Pressure: 2905 PSI
First Initial Flow Pressure: 146 PSI First Final Flow Pressure: 324 PSI Initial Shut-in Pressure: 2094 PSI Second Initial Flow Pressure: 365 PSI Second Final Flow Pressure: 1301 PSI Final Shut-in Pressure: 2066 PSI Final Hydro Pressure: 2802 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 297.52 ft. Drill Pipe Length: ft. |
Initial Flow: Fair blow built to bottom of bucket in 2 mins. Diesel bucket Initial Shut-in: Bled down for 2 mins. built back to bottom in 6 mins. Final Flow: Fair blow built to bottom of bucket in 2 1/2 mins. Gas to surface in 57 mins. gauge gas Final Shut-in: Bled off for 2 mins. built back to bottom of bucket in 4 1/2 mins. |
|
Bottom Hole Temperature: 142 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 2680 of Total Fluid 297.52 of Fluid in Drill Collars 3064 of Gas in pipe 90 of Free Oil 60 of Gas and oil cut muddy water 2530 of Salt water 145000 of Salinity (PPM) 38 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |