Drill Stem Tests Database
Specific Well--15-119-21019
API: 15-119-21019
Operator: Raydon Exploration, Inc.
Field: Wildcat
Lease: Adams, R.
Well 1-27
Location: T34S R30W, Sec. 27, NW NW
660 South, 660 East, from NW corner
Longitude: -100.5765402
Latitude: 37.0663286
County: Meade
Status: D&A
Spud Date: 26-JAN-00
Completion Date: 09-FEB-00
Plugging Date: 10-FEB-00
Total Depth: 6520
Form. at depth: CHESTER
Elevation: 2693 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 6410 to 6440
Formation tested: St. Louis
Date, Time: 09-FEB-00; 21:26:05
Initial Hydro Pressure: 3184 PSI
First Initial Flow Pressure: 98 PSI
First Final Flow Pressure: 269 PSI
Initial Shut-in Pressure: 1911 PSI
Second Initial Flow Pressure: 293 PSI
Second Final Flow Pressure: 459 PSI
Final Shut-in Pressure: 1935 PSI
Final Hydro Pressure: 3111 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 685 ft.
Drill Pipe Length: 5707 ft.
Initial Flow: Strong bottom of Bucket in 1 min. Cracked 2"" slightly Initial Shutin: 2"" blow-back.
Final Flow: Fair 3"" built to strong bottom of bucket in 11 minutes
Final Shutin: 2"" blow-back. Remarks: Est. 16 Ft. of pay. bottom packer held. Pit chlorides 2600ppm
Bottom Hole Temperature: 139 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
915 of Total Fluid
685 of Fluid in Drill Collars
230 of Fluid in Drill Pipe
1535 of Gas In Pipe
15 of Slight Water & Mud cut Oil
90 of Heavy oil & gas cut watery mud
100 of Slight Oil & Gas cut muddy water
710 of Gassy Water 3% gas 97% water
45200 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 5699 to 5725
Formation tested: Cherokee
Date, Time: 05-FEB-00; 07:47:14
Initial Hydro Pressure: 2652 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 254 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 32 PSI
Final Shut-in Pressure: 459 PSI
Final Hydro Pressure: 2580 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 686 ft.
Drill Pipe Length: 4992 ft.
Initial Flow: Weak surface blow built to 6"". Initial Shut-In: Bled 2"". No blow back.
Final Flow: Fair 6"" blow. Built to bottom of bucket in 50 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.