Drill Stem Tests Database
Specific Well--15-129-21591
API: 15-129-21591
Operator: PIONEER OIL COMPANY, INC.
Field: Kinsler
Lease: Ruby Kinsler
Well 1-41
Location: T32S R40W, Sec. 4, NE NE NE
4952 North, 282 West, from SE corner
Longitude: -101.6653261
Latitude: 37.3005447
County: Morton
Status: GAS
Spud Date: 24-AUG-99
Completion Date: 07-SEP-99
Plugging Date:
Total Depth: 3260
Form. at depth: MISSISSIPPIAN
Elevation: 3280 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 2849 to 2897
Formation tested: Wabaunsee
Date, Time: 28-AUG-99; 20:46:48
Initial Hydro Pressure: 1422 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 225 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 239 PSI
Final Hydro Pressure: 1385 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 374 ft.
Drill Pipe Length: 2539 ft.
Initial Flow: Weak blow built to 2""
Final Flow: Weak blow built to 2.5""
Bottom Hole Temperature: 100 DEG F
Percent Porosity:
Samples: no
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
75 of Gas in pipe
15 of 100% Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3129 to 3153
Formation tested: Topeka
Date, Time: 30-AUG-99; 14:32:21
Initial Hydro Pressure: 1518 PSI
First Initial Flow Pressure: 73 PSI
First Final Flow Pressure: 122 PSI
Initial Shut-in Pressure: 320 PSI
Second Initial Flow Pressure: 100 PSI
Second Final Flow Pressure: 135 PSI
Final Shut-in Pressure: 318 PSI
Final Hydro Pressure: 1501 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 374 ft.
Drill Pipe Length: 2760 ft.
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 3 mins.
Final Flow: Very strong blow bottom of bucket as soon as tool opened
Bottom Hole Temperature: 100 DEG F
Percent Porosity:
Samples: Yes 1
Gas Recovery:
Comments:
Recovery
50 of Total Fluid
50 of Fluid in Drill Collars
50 of Drilling mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.