|
API: 15-129-21599
Operator: PIONEER OIL COMPANY Field: Wildcat Lease: HALL Well 1-155 |
Location: T32S R40W, Sec. 5, SE SW SE
330 North, 1650 West, from SE corner Longitude: -101.6880314 Latitude: 37.2877203 County: Morton Status: D&A |
Spud Date: 14-JAN-00
Completion Date: 27-JAN-00 Plugging Date: 27-JAN-00 Total Depth: 5600 Form. at depth: MISSISSIPPIAN Elevation: 3335 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4464 to 4501
Formation tested: Marmaton | Date, Time: 22-JAN-00; 08:03:06 |
|
Initial Hydro Pressure: 2090 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: 1126 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 35 PSI Final Shut-in Pressure: 1116 PSI Final Hydro Pressure: 2052 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 750 ft. Drill Pipe Length: 3701 ft. |
|
Initial Flow: Strong bottom of bucket in 1 minute Gauged 72,400 CFPD Initial Shutin: No blow back Final Flow: Gauged 121,000 CFPD Final Shutin: No blow back Remarks: Est. 5 ft. of pay. Gas burned |
|
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: 12 Samples: One Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 4431 of GIP 20 of Mud 100%M 1400 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5264 to 5288
Formation tested: Middle Morrow | Date, Time: 25-JAN-00; 01:24:11 |
|
Initial Hydro Pressure: 2471 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 907 PSI Second Initial Flow Pressure: 10 PSI Second Final Flow Pressure: 19 PSI Final Shut-in Pressure: 1104 PSI Final Hydro Pressure: 2457 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 750 ft. Drill Pipe Length: 4509 ft. |
|
Initial Flow: Surface blow built to 2"" in 15 minutes. Initial Shut-In: No blow back. Final Flow: Strong bottom of bucket immediately. Decreased slightly in 45 minutes. Final Shut-In: No blow back. Remarks: Established 6 feet of pay. |
|
|
Bottom Hole Temperature: 131 DEG F
Percent Porosity: 8 Samples: None Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 1010 of Gas in pipe 20 of Mud 950 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |