API: 15-007-22601
Operator: Woolsey Petroleum Corp. Field: Aetna Lease: Bell 'A' Well 2 |
Location: T33S R13W, Sec. 29, SE NW SE
1650 North, 1650 West, from SE corner Longitude: -98.7549338 Latitude: 37.1421881 County: Barber Status: GAS |
Spud Date: 12-NOV-99
Completion Date: 23-DEC-99 Plugging Date: Total Depth: 4800 Form. at depth: LANSING Elevation: 1723 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3926 to 3970
Formation tested: Snyderville | Date, Time: 19-NOV-99; 22:21:14 |
Initial Hydro Pressure: 1936 PSI
First Initial Flow Pressure: 41 PSI First Final Flow Pressure: 29 PSI Initial Shut-in Pressure: 680 PSI Second Initial Flow Pressure: 36 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 1381 PSI Final Hydro Pressure: 1849 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3918 ft. |
Initial Flow: Weak building to bottom of bucket in 8 minutes Initial Shut-in: Blow built to 7"" Final Flow: Strong blow immediatly- Gas to surface 45 minutes into final flow gauged 7.5 mcfd at end of flow Final Shut-in: Blow built to 8"" |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 16 Samples: 1 taken final flow Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of Slightly gassy mud 7000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4316 to 4335
Formation tested: Lansing (E) | Date, Time: 21-NOV-99; 20:19:07 |
Initial Hydro Pressure: 2136 PSI
First Initial Flow Pressure: 32 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 1547 PSI Second Initial Flow Pressure: 34 PSI Second Final Flow Pressure: 51 PSI Final Shut-in Pressure: 1577 PSI Final Hydro Pressure: 2112 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4318 ft. |
Initial Flow: Strong blow bottom of bucket in 30 secs. Initial Shut-in: Bled down for 2 mins.no blow back. Final Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 8 mins. gauge gas Final Shut-in: Bled down for 2 mins. no blow back no blow back |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: caraway analytical 728 N. Roosevelt Gas Recovery: Comments: | |
Recovery 70 of Total Fluid 70 of Fluid in Drill Pipe 4248 of Gas in pipe 70 of Slight gas cut watery mud 40000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4374 to 4397
Formation tested: Lans G | Date, Time: 23-NOV-99; 02:32:12 |
Initial Hydro Pressure: 2141 PSI
First Initial Flow Pressure: 87 PSI First Final Flow Pressure: 140 PSI Initial Shut-in Pressure: 1676 PSI Second Initial Flow Pressure: 141 PSI Second Final Flow Pressure: 233 PSI Final Shut-in Pressure: 1681 PSI Final Hydro Pressure: 2055 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4380 ft. |
Initial Flow: Strong blow bottom of bucket in 20 secs. gas to surface in 22 mins. Initial Shut-in: Very weak blow. Final Flow: Strong blow Final Shut-in: Weak blow 1 - 2 1/2"" |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 12 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 440 of Total Fluid 440 of Fluid in Drill Pipe 90 of Watery mud 20% water 80% mud 350 of Salt water. 150000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4476 to 4490
Formation tested: Lans I | Date, Time: 24-NOV-99; 07:01:19 |
Initial Hydro Pressure: 2216 PSI
First Initial Flow Pressure: 40 PSI First Final Flow Pressure: 60 PSI Initial Shut-in Pressure: 1765 PSI Second Initial Flow Pressure: 68 PSI Second Final Flow Pressure: 44 PSI Final Shut-in Pressure: 1767 PSI Final Hydro Pressure: 2131 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4474 ft. |
Initial Flow: Strong blow bottom of bucket in 5-10 secs. gas to surface in 8.5 mins Initial Shut-in: No blow. Final Flow: Strong blow Final Shut-in: No blow |
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 12 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 45 of Total Fluid 45 of Fluid in Drill Pipe 45 of Water mud 26% water 74% mud 7000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 4642 to 4680
Formation tested: Miss. | Date, Time: 25-NOV-99; 21:22:00 |
Initial Hydro Pressure: 2301 PSI
First Initial Flow Pressure: 42 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 1013 PSI Second Initial Flow Pressure: 25 PSI Second Final Flow Pressure: 29 PSI Final Shut-in Pressure: 1443 PSI Final Hydro Pressure: 2187 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4631 ft. |
Initial Flow: Strong blow bottom of bucket in 1 1/2 mins. Initial Shut-in: No blow. Final Flow: Strong blow bottom of bucket in 5 - 10 secs. Final Shut-in: No blow |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
Recovery 32 of Total Fluid 32 of Fluid in Drill Pipe 3900 of Gas in pipe. 32 of Drilling mud 7000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4119 to 4140
Formation tested: Lansing A | Date, Time: 20-NOV-99; 08:36:54 |
Initial Hydro Pressure: 2004 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 1360 PSI Second Initial Flow Pressure: 17 PSI Second Final Flow Pressure: 28 PSI Final Shut-in Pressure: 1449 PSI Final Hydro Pressure: 1946 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4104 ft. |
Initial Flow: Weak building to bottom of bucket in 8 minutes Initial Shut-in: Weak 1/8"" blow Final Flow: 5"" blow building to bottom of bucket in 20 mins. Final Shut-in: Weak surface blow |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
Recovery 30 of Total Fluid 30 of Fluid in Drill Pipe 30 of gassy mud 600 of gas in pipe 7500 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |